My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reese Construction Company 4/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Reese Construction Company 4/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 3:29:23 PM
Creation date
4/28/2023 3:22:42 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reese Construction Company
Approval Date
4/27/2023
Council Approval Date
4/12/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
2023 Pavement Maintenance Overlay
Public Works WO Number
PW3789
Tracking Number
0003679
Total Compensation
$1,616,161.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACT <br /> Item#4 <br /> Supplement to Appendix D a one-page detail titled Addenduml -BIKE LANE BUFFER DETAIL.pdf, see <br /> attached. <br /> Item#5 <br /> Page vii, Notice to Contractor's, Paragraph 1, Last Sentence, <br /> Strikeout$1,617,129.51 and replace with $1,615,836.42 <br /> PROPOSAL <br /> Item#6 <br /> Page 86, Bid Proposal, <br /> Strikeout Item#18, Plastic Line, Bid Qty 10,2/16 LF and replace with Bid Qty 42,814 LF. <br /> Item#7 <br /> Page 86, Bid Proposal, <br /> Strikeout Item#27,Vehicle Loop Detectors, Bid Qty 2,162 LF and replace with Bid Qty 1,315 LF. <br /> Item#8 <br /> Page 86, Bid Proposal, <br /> Add Bid Item#36,Video Detection System, Bid Qty 1 Lump Sum. <br /> ANSWERS TO QUESTIONS SUBMITTED FOR CLARIFICATION <br /> Q1 Could you clarify Materials used for Green Pavement Markings Can I use Type B or Type D <br /> Materials for Items 19,20 and 23?-Al: Yes, Type B and Type D Materials are allowed for Bike <br /> Markings. <br /> Q2 How does painting parking lines get paid? -A2: Parking lines are paid for by bid item#18, <br /> Plastic Line, per LF. <br /> Q3 Is there a detail for the bike buffer layout and is there RPMs on bike buffer? Items 14 & 18 <br /> include what profiled plastic lines? -A3:No, details of the bike lane buffer were not in the bid <br /> plan set but are issued as part of this Addendum#1. Raised pavement markers(RPMs) are not <br /> on the bike buffer. Profiled plastic lines are not in this project. <br /> Q4 pertains to the Traffic Loops. I am curious if all the locations indicated on the drawings already <br /> had existing loops in place which would include the bike loops as well as traffic loops. After using google <br /> earth it seemed like there were only a couple spots where I could see visible loops. Being that there <br /> isn't any drawings indicating that we land wires in the control panel it leads me to believe all we are <br /> doing is splicing in an existing J-box. Can you confirm if all locations for traffic/bike loops previously <br /> Addendum#1 2023 Pavement Maintenance Overlay-WO 3789 Page 2 <br /> CITY OF EVERETT • 3200 Cedar Street • Everett,WA 98201 • (425) 257-8800 • Fax(425)257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.