Laserfiche WebLink
1 A noise variance for early start has been obtained on behalf of the Contractor. The <br /> 2 early start time to begin traffic control only shall be requested and approved by the <br /> 3 Engineer at the preconstruction conference. The Engineer has the right to disallow <br /> 4 the early start if the Contractor performs other work than traffic control setup. All <br /> 5 mitigation measures stated in the contract and appendix shall be adhered to. <br /> 6 <br /> 7 <br /> 8 <br /> 9 <br /> 10 <br /> 11 <br /> 12 <br /> 13 <br /> 14 <br /> 15 <br /> 16 <br /> 17 <br /> 18 <br /> 19 <br /> 20 <br /> 21 <br /> 22 <br /> 23 <br /> 24 <br /> 25 *** <br /> 26 <br /> 27 If the Engineer determines the permitted closure hours adversely affect traffic, the <br /> 28 Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br /> 29 in writing of any change in the closure hours. Exceptions to these restrictions may be <br /> 30 considered by the Engineer on a case-by-case basis following a written request by <br /> 31 the Contractor. <br /> 32 <br /> 33 Lane, ramp, shoulder, and roadway closures are not allowed on any of the following: <br /> 34 <br /> 35 1. A holiday, <br /> 36 <br /> 37 2. A holiday weekend; holidays that occur on Friday, Saturday, Sunday or <br /> 38 Monday are considered a holiday weekend. A holiday weekend includes <br /> 39 Saturday, Sunday, and the holiday. <br /> 40 <br /> 41 3. After*** 2:30 P.M. *** on the day prior to a holiday or holiday weekend, and <br /> 42 <br /> 43 4. Before *** 7:00 A.M *** on the day after the holiday or holiday weekend. <br /> 44 <br /> 45 5. The two-hour period prior to and the two-hour period after the following <br /> 46 special events: <br /> 47 <br /> 48 *** N/A. *** <br /> 49 <br /> 50 It shall be the Contractor's responsibility to obtain the dates and times of all <br /> 51 events. <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 25 <br />