My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reese Construction Company 4/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Reese Construction Company 4/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 3:29:23 PM
Creation date
4/28/2023 3:22:42 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reese Construction Company
Approval Date
4/27/2023
Council Approval Date
4/12/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
2023 Pavement Maintenance Overlay
Public Works WO Number
PW3789
Tracking Number
0003679
Total Compensation
$1,616,161.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 5. If Davis Bacon wage rates apply to this Contract, all requirements must be <br /> 2 met and recorded properly on certified payroll <br /> 3 <br /> 4 1-08.1.GR1 <br /> 5 Subcontracting <br /> 6 <br /> 7 1-08.1.OptionB.RTF <br /> 8 1-08.1 Subcontracting <br /> 9 (May 30, 2019 APWA GSP, Option 8) <br /> 10 <br /> 11 Delete the ninth paragraph, beginning with "On all projects, the Contractor shall certify...". <br /> 12 <br /> 13 1-08.3.GR1 <br /> 14 Progress Schedule <br /> 15 <br /> 16 1-08.3(2).GR1 <br /> 17 Progress Schedule Types <br /> 18 <br /> 19 COE1-08.3(2)A.RTF <br /> 20 1-08.3(2)A Type A Progress Schedule <br /> 21 (March 13, 2012 APWA GSP) <br /> 22 <br /> 23 Revise this section to read: <br /> 24 <br /> 25 The Contractor shall submit *** 3 'F** copies of a Type A Progress Schedule no later than <br /> 26 at the preconstruction conference, or some other mutually agreed upon submittal time. <br /> 27 The schedule may be a critical path method (CPM) schedule, bar chart, or other standard <br /> 28 schedule format. Regardless of which format used, the schedule shall identify the critical <br /> 29 path. The Engineer will evaluate the Type A Progress Schedule and approve or return the <br /> 30 schedule for corrections within 15 calendar days of receiving the submittal. <br /> 31 <br /> 32 1-08.4.RTF <br /> 33 1-08.4 Prosecution of Work <br /> 34 <br /> 35 Delete this section and replace it with the following: <br /> 36 <br /> 37 1-08.4 Notice to Proceed and Prosecution of Work <br /> 38 (July 23, 2015 APWA GSP) <br /> 39 <br /> 40 Notice to Proceed will be given after the contract has been executed and the contract <br /> 41 bond and evidence of insurance have been approved and filed by the Contracting <br /> 42 Agency. The Contractor shall not commence with the work until the Notice to Proceed <br /> 43 has been given by the Engineer. The Contractor shall commence construction activities <br /> 44 on the project site within ten days of the Notice to Proceed Date, unless otherwise <br /> 45 approved in writing. The Contractor shall diligently pursue the work to the physical <br /> 46 completion date within the time specified in the contract. Voluntary shutdown or slowing <br /> 47 of operations by the Contractor shall not relieve the Contractor of the responsibility to <br /> 48 complete the work within the time(s) specified in the contract. <br /> 49 <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.