Laserfiche WebLink
1 5. If Davis Bacon wage rates apply to this Contract, all requirements must be <br /> 2 met and recorded properly on certified payroll <br /> 3 <br /> 4 1-08.1.GR1 <br /> 5 Subcontracting <br /> 6 <br /> 7 1-08.1.OptionB.RTF <br /> 8 1-08.1 Subcontracting <br /> 9 (May 30, 2019 APWA GSP, Option 8) <br /> 10 <br /> 11 Delete the ninth paragraph, beginning with "On all projects, the Contractor shall certify...". <br /> 12 <br /> 13 1-08.3.GR1 <br /> 14 Progress Schedule <br /> 15 <br /> 16 1-08.3(2).GR1 <br /> 17 Progress Schedule Types <br /> 18 <br /> 19 COE1-08.3(2)A.RTF <br /> 20 1-08.3(2)A Type A Progress Schedule <br /> 21 (March 13, 2012 APWA GSP) <br /> 22 <br /> 23 Revise this section to read: <br /> 24 <br /> 25 The Contractor shall submit *** 3 'F** copies of a Type A Progress Schedule no later than <br /> 26 at the preconstruction conference, or some other mutually agreed upon submittal time. <br /> 27 The schedule may be a critical path method (CPM) schedule, bar chart, or other standard <br /> 28 schedule format. Regardless of which format used, the schedule shall identify the critical <br /> 29 path. The Engineer will evaluate the Type A Progress Schedule and approve or return the <br /> 30 schedule for corrections within 15 calendar days of receiving the submittal. <br /> 31 <br /> 32 1-08.4.RTF <br /> 33 1-08.4 Prosecution of Work <br /> 34 <br /> 35 Delete this section and replace it with the following: <br /> 36 <br /> 37 1-08.4 Notice to Proceed and Prosecution of Work <br /> 38 (July 23, 2015 APWA GSP) <br /> 39 <br /> 40 Notice to Proceed will be given after the contract has been executed and the contract <br /> 41 bond and evidence of insurance have been approved and filed by the Contracting <br /> 42 Agency. The Contractor shall not commence with the work until the Notice to Proceed <br /> 43 has been given by the Engineer. The Contractor shall commence construction activities <br /> 44 on the project site within ten days of the Notice to Proceed Date, unless otherwise <br /> 45 approved in writing. The Contractor shall diligently pursue the work to the physical <br /> 46 completion date within the time specified in the contract. Voluntary shutdown or slowing <br /> 47 of operations by the Contractor shall not relieve the Contractor of the responsibility to <br /> 48 complete the work within the time(s) specified in the contract. <br /> 49 <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 30 <br />