My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reese Construction Company 4/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Reese Construction Company 4/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 3:29:23 PM
Creation date
4/28/2023 3:22:42 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reese Construction Company
Approval Date
4/27/2023
Council Approval Date
4/12/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
2023 Pavement Maintenance Overlay
Public Works WO Number
PW3789
Tracking Number
0003679
Total Compensation
$1,616,161.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Except in the case of emergency or unless otherwise approved by the Engineer, the <br /> 2 normal working hours for the Contract shall be any consecutive 8-hour period <br /> 3 between 7:00 a.m. and 6:00 p.m. or as required by section F1-07.23(1). Monday <br /> 4 through Friday, exclusive of a lunch break. If the Contractor desires different than the <br /> 5 normal working hours stated above, the request must be submitted in writing prior to <br /> 6 the preconstruction conference, subject to the provisions below. The working hours <br /> 7 for the Contract shall be established at or prior to the preconstruction conference. <br /> 8 <br /> 9 All working hours and days are also subject to local permit and ordinance conditions <br /> 10 (such as noise ordinances). <br /> 11 <br /> 12 If the Contractor wishes to deviate from the established working hours,the Contractor <br /> 13 shall submit a written request to the Engineer for consideration. This request shall <br /> 14 state what hours are being requested, and why. Requests shall be submitted for <br /> 15 review no later than ***72 hours for day work and 30 days for night work*** prior to <br /> 16 the day(s) the Contractor is requesting to change the hours. <br /> 17 <br /> 18 A Noise Variance, which shall be provided by the City, is required for Contract <br /> 19 nighttime work and included as an appendix in these specifications. If the Contractor <br /> 20 or the Engineer requests to do nighttime work that is not already established in the <br /> 21 Contract, a 30-day notice is required. The Engineer will then review the request and <br /> 22 apply for the Noise Variance; the City can deny the request at its sole discretion. <br /> 23 Nighttime work is considered to be between 10 pm and 7 am unless otherwise stated. <br /> 24 The following mitigation measures shall be in effect during a Noise Variance, though <br /> 25 there may be additional project specific requirements: <br /> 26 • Back-up alarms shall be directional broad band type alarms. <br /> 27 • Trucks performing export haul shall have well maintained bed liners. <br /> 28 • Tailgate slamming will be prohibited. <br /> 29 • No construction work shall be allowed between 6 pm and 8 am on Saturdays, <br /> 30 Sundays, or federally recognized holidays unless otherwise stated in the <br /> 31 Noise Variance Permit. <br /> 32 <br /> 33 If the Contracting Agency approves such a deviation, such approval may be subject <br /> 34 to certain other conditions, which will be detailed in writing. For example: <br /> 35 <br /> 36 1. On non-Federal aid projects, requiring the Contractor to reimburse the <br /> 37 Contracting Agency for the costs in excess of straight-time costs for <br /> 38 Contracting Agency representatives who worked during such times. (The <br /> 39 Engineer may require designated representatives to be present during the <br /> 40 work. Representatives who may be deemed necessary by the Engineer <br /> 41 include but are not limited to: survey crews; personnel from the Contracting <br /> 42 Agency's material testing lab; inspectors; and other Contracting Agency <br /> 43 employees or third party consultants when, in the opinion of the Engineer, <br /> 44 such work necessitates their presence.) <br /> 45 2. Considering the work performed on Saturdays, Sundays, and holidays as <br /> 46 working days with regard to the contract time. <br /> 47 3. Considering multiple work shifts as multiple working days with respect to <br /> 48 contract time even though the multiple shifts occur in a single 24-hour period. <br /> 49 4. If a 4-10 work schedule is requested and approved the non-working day for <br /> 50 the week will be charged as a working day. <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.