My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reese Construction Company 4/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Reese Construction Company 4/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 3:29:23 PM
Creation date
4/28/2023 3:22:42 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reese Construction Company
Approval Date
4/27/2023
Council Approval Date
4/12/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
2023 Pavement Maintenance Overlay
Public Works WO Number
PW3789
Tracking Number
0003679
Total Compensation
$1,616,161.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 e. Copies of the approved "Affidavit of Prevailing Wages Paid" for the Contractor <br /> 2 and all Subcontractors <br /> 3 f. A copy of the Notice of Termination sent to the Washington State Department of <br /> 4 Ecology (Ecology); the elapse of 30 calendar days from the date of receipt of the <br /> 5 Notice of Termination by Ecology; and no rejection of the Notice of Termination <br /> 6 by Ecology. This requirement will not apply if the Construction Stormwater <br /> 7 General Permit is transferred back to the Contracting Agency in accordance with <br /> 8 Section 8-01.3(16). <br /> 9 g. Property owner releases per Section 1-07.24 <br /> 10 <br /> 11 1-08.5:INST2.GR1 <br /> 12 Section 1-08.5 is supplemented with the following: <br /> 13 <br /> 14 F1-08.5.OPT7.DOCX <br /> 15 (March 13, 1995) <br /> 16 <br /> 17 This project shall be physically completed within *** thirty-three (33) working days. *** <br /> 18 <br /> 19 GLF 1-08.9.OptionB LD induction Ioop.docx <br /> 20 1-08.9 Liquidated Damages <br /> 21 (March 3, 2021 APWA GSP, Option B & City of Everett) <br /> 22 <br /> 23 Revise the second and third paragraphs to read: <br /> 24 <br /> 25 Accordingly, the Contractor agrees: <br /> 26 <br /> 27 (1). To pay liquidated damages in the amount of$3000 per working day for failure <br /> 28 to splice, test, and make operational induction loops within 10 working days <br /> 29 after installation of the final mat of asphalt overlay over each induction loop in <br /> 30 accordance with Section 8-20.3(14)C in these Special Provisions. <br /> 31 <br /> 32 (2). In addition to the liquidated damages in (1) above, to pay (according to the <br /> 33 following formula) liquidated damages for each working day beyond the <br /> 34 number of working days established for Physical Completion, and <br /> 35 <br /> 36 (3). To authorize the Engineer to deduct these liquidated damages from any <br /> 37 money due or coming due to the Contractor. <br /> 38 <br /> 39 Liquidated Damages Formula <br /> 40 <br /> 41 LD=0.15C/T <br /> 42 <br /> 43 Where: <br /> 44 <br /> 45 LD = liquidated damages per working day (rounded to the nearest dollar) <br /> 46 C = original Contract amount <br /> 47 T = original time for Physical Completion <br /> 48 <br /> 49 When the Contract Work has progressed to Substantial Completion as defined in the <br /> 50 Contract, the Engineer may determine the Contract Work is Substantially Complete. The <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.