Laserfiche WebLink
1 Failure to perform any of the obligations under the Contract by the Contractor may be <br /> 2 decreed by the Contracting Agency to be adequate reason for withholding any payments <br /> 3 until compliance is achieved. <br /> 4 <br /> 5 Upon completion of all Work and after final inspection (Section 1-05.11), the amount due <br /> 6 the Contractor under the Contract will be paid based upon the final estimate made by the <br /> 7 Engineer and presentation of a Final Contract Voucher Certification to be signed by the <br /> 8 Contractor. The Contractor's signature on such voucher shall be deemed a release of all <br /> 9 claims of the Contractor unless a Certified Claim is filed in accordance with the <br /> 10 requirements of Section 1-09.11 and is expressly excepted from the Contractor's <br /> 11 certification on the Final Contract Voucher Certification. The date the Contracting Agency <br /> 12 signs the Final Contract Voucher Certification constitutes the final acceptance date <br /> 13 (Section 1-05.12). <br /> 14 <br /> 15 If the Contractor fails, refuses, or is unable to sign and return the Final Contract Voucher <br /> 16 Certification or any other documentation required for completion and final acceptance of <br /> 17 the Contract, the Contracting Agency reserves the right to establish a Completion Date <br /> 18 (for the purpose of meeting the requirements of RCW 60.28) and unilaterally accept the <br /> 19 Contract. Unilateral final acceptance will occur only after the Contractor has been <br /> 20 provided the opportunity, by written request from the Engineer, to voluntarily submit such <br /> 21 documents. If voluntary compliance is not achieved, formal notification of the impending <br /> 22 establishment of a Completion Date and unilateral final acceptance will be provided by <br /> 23 email with delivery confirmation from the Contracting Agency to the Contractor, which will <br /> 24 provide 30 calendar days for the Contractor to submit the necessary documents. The 30 <br /> 25 calendar day period will begin on the date the email with delivery confirmation is received <br /> 26 by the Contractor. The date the Contracting Agency unilaterally signs the Final Contract <br /> 27 Voucher Certification shall constitute the Completion Date and the final acceptance date <br /> 28 (Section 1-05.12). The reservation by the Contracting Agency to unilaterally accept the <br /> 29 Contract will apply to Contracts that are Physically Completed in accordance with <br /> 30 Section 1-08.5, or for Contracts that are terminated in accordance with Section 1-08.10. <br /> 31 Unilateral final acceptance of the Contract by the Contracting Agency does not in any <br /> 32 way relieve the Contractor of their responsibility to comply with all Federal, State, tribal, <br /> 33 or local laws, ordinances, and regulations that affect the Work under the Contract. <br /> 34 <br /> 35 Payment to the Contractor of partial estimates, final estimates, and retained percentages <br /> 36 shall be subject to controlling laws. <br /> 37 <br /> 38 1-09.9(1).GR1 <br /> 39 Retainage <br /> 40 <br /> 41 1-09.9(1),INSTI.GR1 <br /> 42 Section 1-09.9(1) content and title is deleted and replaced with the following: <br /> 43 <br /> 44 1-09.9(1).OPTI.GR1 <br /> 45 (June 27, 2011) <br /> 46 Vacant <br /> 47 <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO##3789 February 14,2023 35 <br />