Laserfiche WebLink
1 <br /> 2 The basis of payment will be the actual quantities of Work performed according to the <br /> 3 Contract and as specified for payment. <br /> 4 <br /> 5 The Contractor shall submit a breakdown of the cost of lump sum bid items at the <br /> 6 Preconstruction Conference, to enable the Project Engineer to determine the Work <br /> 7 performed on a monthly basis. A breakdown is not required for lump sum items that <br /> 8 include a basis for incremental payments as part of the respective Specification. Absent <br /> 9 a lump sum breakdown, the Project Engineer will make a determination based on <br /> 10 information available. The Project Engineer's determination of the cost of work shall be <br /> 11 final. <br /> 12 <br /> 13 Progress payments for completed work and material on hand will be based upon <br /> 14 progress estimates prepared by the Engineer. A progress estimate cutoff date will be <br /> 15 established at the preconstruction conference. <br /> 16 <br /> 17 The initial progress estimate will be made not later than 30 days after the Contractor <br /> 18 commences the work, and successive progress estimates will be made every month <br /> 19 thereafter until the Completion Date. Progress estimates made during progress of the <br /> 20 work are tentative, and made only for the purpose of determining progress payments. <br /> 21 The progress estimates are subject to change at any time prior to the calculation of the <br /> 22 final payment. <br /> 23 <br /> 24 The value of the progress estimate will be the sum of the following: <br /> 25 1. Unit Price Items in the Bid Form —the approximate quantity of acceptable units of <br /> 26 work completed multiplied by the unit price. <br /> 27 2. Lump Sum Items in the Bid Form — based on the approved Contractor's lump sum <br /> 28 breakdown for that item, or absent such a breakdown, based on the Engineer's <br /> 29 determination. <br /> 30 3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job site <br /> 31 or other storage area approved by the Engineer. <br /> 32 4. Change Orders— entitlement for approved extra cost or completed extra work as <br /> 33 determined by the Engineer. <br /> 34 <br /> 35 Progress payments will be made in accordance with the progress estimate less: <br /> 36 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; <br /> 37 2. The amount of progress payments previously made; and <br /> 38 3. Funds withheld by the Contracting Agency for disbursement in accordance with the <br /> 39 Contract Documents. <br /> 40 <br /> 41 Progress payments for work performed shall not be evidence of acceptable performance <br /> 42 or an admission by the Contracting Agency that any work has been satisfactorily <br /> 43 completed. The determination of payments under the contract will be final in accordance <br /> 44 with Section 1-05.1. <br /> 45 <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WOB3789 February 14,2023 34 <br />