My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reese Construction Company 4/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Reese Construction Company 4/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 3:29:23 PM
Creation date
4/28/2023 3:22:42 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reese Construction Company
Approval Date
4/27/2023
Council Approval Date
4/12/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
2023 Pavement Maintenance Overlay
Public Works WO Number
PW3789
Tracking Number
0003679
Total Compensation
$1,616,161.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 • The proposed HMA mix design on WSDOT Form 350-042 with the seal and <br /> 2 certification (stamp & signature) of a valid licensed Washington State <br /> 3 Professional Engineer. <br /> 4 • The Mix Design Report for the proposed HMA mix design developed by a <br /> 5 qualified City or County laboratory that is within one year of the approval date.** <br /> 6 <br /> 7 The mix design shall be performed by a lab accredited by a national authority such as <br /> 8 Laboratory Accreditation Bureau, L-A-B for Construction Materials Testing, The <br /> 9 Construction Materials Engineering Council (CMEC's) ISO 17025 or AASHTO <br /> 10 Accreditation Program (AAP) and shall supply evidence of participation in the AASHTO: <br /> 11 resource proficiency sample program. <br /> 12 <br /> 13 Mix designs for HMA accepted by Nonstatistical evaluation shall; <br /> 14 <br /> 15 • Have the aggregate structure and asphalt binder content determined in <br /> 16 accordance with WSDOT Standard Operating Procedure 732 and meet the <br /> 17 requirements of Sections 9-03.8(2), except that Hamburg testing for ruts and <br /> 18 stripping are at the discretion of the Engineer, and 9-03.8(6). <br /> 19 • Have anti-strip requirements, if any, for the proposed mix design determined in <br /> 20 accordance with AASHTO T 283 or T 324, or based on historic anti-strip and <br /> 21 aggregate source compatibility from previous WSDOT lab testing. <br /> 22 <br /> 23 At the discretion of the Engineer, agencies may accept verified mix designs older than 12 <br /> 24 months from the original verification date with a certification from the Contractor that the <br /> 25 materials and sources are the same as those shown on the original mix design. <br /> 26 <br /> 27 Commercial Evaluation Approval of a mix design for "Commercial Evaluation" will be <br /> 28 based on a review of the Contractor's submittal of WSDOT Form 350-042 (For <br /> 29 commercial mixes, AASHTO T 324 evaluation is not required) or a Mix Design from the <br /> 30 current WSDOT QPL or from one of the processes allowed by this section. Testing of the <br /> 31 HMA by the Contracting Agency for mix design approval is not required. <br /> 32 <br /> 33 For the Bid Item Commercial HMA, the Contractor shall select a class of HMA and <br /> 34 design level of Equivalent Single Axle Loads (ESAL's) appropriate for the required use. <br /> 35 <br /> 36 5-04.2(2)A Vacant <br /> 37 <br /> 38 5-04.2(2)B Using Warm Mix Asphalt Processes <br /> 39 The Contractor may elect to use additives that reduce the optimum mixing temperature <br /> 40 or serve as a compaction aid for producing HMA. Additives include organic additives, <br /> 41 chemical additives and foaming processes. The use of Additives is subject to the <br /> 42 following: <br /> 43 <br /> 44 • Do not use additives that reduce the mixing temperature more than allowed in <br /> 45 Section 5-04.3(6) in the production of mixtures. <br /> 46 • Before using additives, obtain the Engineer's approval using WSDOT Form 350- <br /> 47 076 to describe the proposed additive and process. <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.