My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reese Construction Company 4/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Reese Construction Company 4/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 3:29:23 PM
Creation date
4/28/2023 3:22:42 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reese Construction Company
Approval Date
4/27/2023
Council Approval Date
4/12/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
2023 Pavement Maintenance Overlay
Public Works WO Number
PW3789
Tracking Number
0003679
Total Compensation
$1,616,161.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 2 5-04.3 Construction Requirements <br /> 3 <br /> 4 5-04.3(1) Weather Limitations <br /> 5 Do not place HMA for wearing course on any Traveled Way beginning October 1st <br /> 6 through March 31st of the following year without written concurrence from the Engineer. <br /> 7 <br /> 8 Do not place HMA on any wet surface, or when the average surface temperatures are <br /> 9 less than those specified below, or when weather conditions otherwise prevent the <br /> 10 proper handling or finishing of the HMA. <br /> 11 <br /> 12 Minimum Surface Temperature for Paving <br /> Compacted Thickness Wearing Course Other Courses <br /> (Feet) <br /> Less than 0.10 55°F 45°F <br /> 0.10 to .20 45°F 35°F <br /> More than 0.20 35°F 35°F <br /> 13 <br /> 14 5-04.3(2) Paving Under Traffic <br /> 15 When the Roadway being paved is open to traffic, the requirements of this Section <br /> 16 shall apply. <br /> 17 <br /> 18 The Contractor shall keep intersections open to traffic at all times except when paving <br /> 19 the intersection or paving across the intersection. During such time, and provided that <br /> 20 there has been an advance warning to the public, the intersection may be closed for the <br /> 21 minimum time required to place and compact the mixture. In hot weather, the Engineer <br /> 22 may require the application of water to the pavement to accelerate the finish rolling of the <br /> 23 pavement and to shorten the time required before reopening to traffic. <br /> 24 <br /> 25 Before closing an intersection, advance warning signs shall be placed and signs shall <br /> 26 also be placed marking the detour or alternate route. <br /> 27 <br /> 28 During paving operations, temporary pavement markings shall be maintained throughout <br /> 29 the project. Temporary pavement markings shall be installed on the Roadway prior to <br /> 30 opening to traffic. Temporary pavement markings shall be in accordance with Section 8- <br /> 31 23. <br /> 32 <br /> 33 All costs in connection with performing the Work in accordance with these requirements <br /> 34 shall be included in the unit Contract prices for the various Bid items involved in the <br /> 35 Contract. <br /> 36 <br /> 37 5-04.3(3) Equipment <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 February 14,2023 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.