My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reese Construction Company 4/27/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Reese Construction Company 4/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2023 3:29:23 PM
Creation date
4/28/2023 3:22:42 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reese Construction Company
Approval Date
4/27/2023
Council Approval Date
4/12/2023
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
2023 Pavement Maintenance Overlay
Public Works WO Number
PW3789
Tracking Number
0003679
Total Compensation
$1,616,161.61
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
260
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 2 *** <br /> 3 <br /> 4 The permanent thermal detection system shall be installed on the signal mast <br /> 5 arm on a 6' long camera mount bracket at a location directed by the Engineer, <br /> 6 as close as practical to the end of the mast arm. The video detection cable shall <br /> 7 be installed in the mast arm per manufacturers recommendations. Any coiled <br /> 8 slack cable shall be mounted to the camera mount bracket at the back of the <br /> 9 pole. In the signal control cabinet, a video detection module shall be installed, <br /> 10 along with a surge protector and 4x6 fuse kit assembly. Video detection cable <br /> 11 hall be connectorized and all cables terminated to complete the system. City of <br /> 12 Everett signal technician will direct location of cable terminations, VIP module, <br /> 13 and other hardware. Through the Engineer, the contractor shall contact Steve <br /> 14 Sawyer (425)328-0643 a minimum 3 days prior to activation to coordinate a <br /> 15 signal technician to be on site. <br /> 16 <br /> 2023 PAVEMENT MAINTENANCE OVERLAY <br /> WO#3789 March 13,2023 Addendum#1 Supplemental Page 73-03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.