My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10312 EVERGREEN WAY GLINT CAR WASH 2023-07-31
>
Address Records
>
EVERGREEN WAY
>
10312
>
GLINT CAR WASH
>
10312 EVERGREEN WAY GLINT CAR WASH 2023-07-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2023 10:58:09 AM
Creation date
5/3/2023 2:09:23 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10312
Tenant Name
GLINT CAR WASH
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GLINT CAR WASH - EVERETT <br /> STORMWATER REPORT <br /> Figure 1-3.3: Flow Chart for Determining MR #5 Requirements <br /> Does the entire project qualify as Flow Control exempt(per MR#7)? <br /> Yes �!�► <br /> * No <br /> Did the project developer choose to meet Does the project trigger <br /> the LID Performance Standard? only MRs#1-#5?(Per (the Pilled triggers Is the project outside <br /> the Project Thresholds in MRs#1-#9) the UGA on a parcel <br /> No Applicability of the " that is 5 acres or larger? <br /> Minimum Requirements <br /> Yes T Section). <br /> REQUIRED:For each <br /> surface,consider the BMPs Yes <br /> in the order listed in List#3 No <br /> for that type of surface.Use <br /> the first BMP that is Did the project <br /> considered feasible. developer choose to <br /> meet the LID f Yes <br /> NOT REQUIRED: Performance Did the project <br /> Achievement of the UD Standard? developer choose to <br /> Performance Standard. NO meet the LID <br /> Performance <br /> Standard? <br /> Yes Vas <br /> REQUIRED:For each <br /> surface,consider the f No <br /> BMPs in the order <br /> listed In List#1 for that <br /> type of surface.Use <br /> the first BMP that is <br /> considered feasible. <br /> NOT REQUIRED: <br /> Achievement of the UD <br /> Performance Standard. <br /> REQUIRED:Meet the UD <br /> REQUIRED:Meet the LID Performance REQUIRED:For each Performance Standard through <br /> Standard through the use of any Flow Control surface,consider the BMPs the use of any Flow Control <br /> BMP(s)in this manual. in the order fisted in List#2 BMP(s)in this manual <br /> for that type of surface.Use <br /> REQUIRED:Apply BMP T5.13 Post the first BMP that is REQUIRED:Apply BMP T5.13 <br /> Construction Soil Quality and Depth. considered festabie. Post-Construction Soil Quality <br /> and Depth. <br /> NOT REQUIRED:Applying the BMPs in Lists NOT REQUIRED: <br /> #1,#2,or#3. Achievement of the LID NOT REQUIRED:Applying the <br /> Performance Standard. BMPs in lists#1,#2,or#3. <br /> Flow Chart for Determining MR #5 <br /> NNW" Requirements <br /> DEPARTMENT <br /> ++O F Revised March 2019 <br /> ECOLOGY Please see http:/Awww.ecy.wa.govlcopyrighthtml for ht notice includin <br /> g n9 permissions, <br /> 111 State of Washington limitation of liability,and disclaimer. <br /> Terraforma Design Group, Inc. <br /> Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.