July 3, 2019 <br /> HWA Project No. 2015-061-21 <br /> material near optimum moisture content. HWA recommends that imported Gravel Borrow <br /> meeting the requirements of the WSDOT standard specifications be used as trench backfill in <br /> wetter times of year. <br /> During placement of the initial lifts, the trench backfill material should not be bulldozed into the <br /> trench or dropped directly on the pipe. Furthermore, heavy vibratory equipment should not be <br /> permitted to operate directly over the pipe until a minimum of 2 feet of backfill has been placed <br /> over the pipe bedding to an in-place density of at least 90 percent of the maximum dry density as <br /> determined using ASTM D-1557. Properly prepared backfill, greater than 2 feet above the pipe <br /> bedding, should be placed in uniform loose lifts not to exceed 12 inches and densely compacted <br /> in a systematic manner using appropriately sized compaction equipment to achieve at least 95 <br /> percent of the maximum dry density as determined using ASTM D-1557. Smaller loose lifts <br /> may be necessary to achieve compaction where hand held compaction equipment such as <br /> jumping jacks, or plate compactors are used. Please note that based on our previous laboratory <br /> testing, if LPSB is used at a ga.s barrier, at least 3 feet of this material compacted to at least 95% <br /> of the maximum dry density, obtained by ASTM D1557, is required. <br /> 0•0 <br /> If you have any questions or require additional information, please contact the undersigned at <br /> your earliest convenience at (425) 774-0106. <br /> HWA GEOSCIENCES INC. <br /> �G F\,VASti/jy <br /> * ,`k's" cr'-• C,o <br /> cn r . a <br /> '53 ..-:;#11:7 <br /> ..."" ".54wr„,....4.;,,,, y-d______...,,, T---- <br /> Exr 9-11-2o <br /> Michael Place, P.E. 7.3-11 <br /> Senior Geotechnical Engineer <br /> Riverfront Boulevard Addendum 2 3 HWA GeoSciences Inc. <br />