My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD Geotech Report 2023-05-04
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
Geotech Report
>
3800 RIVERFRONT BLVD Geotech Report 2023-05-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2023 8:10:16 AM
Creation date
5/4/2023 7:16:17 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 3, 2019 <br /> HWA Project No. 2015-061-21 <br /> material near optimum moisture content. HWA recommends that imported Gravel Borrow <br /> meeting the requirements of the WSDOT standard specifications be used as trench backfill in <br /> wetter times of year. <br /> During placement of the initial lifts, the trench backfill material should not be bulldozed into the <br /> trench or dropped directly on the pipe. Furthermore, heavy vibratory equipment should not be <br /> permitted to operate directly over the pipe until a minimum of 2 feet of backfill has been placed <br /> over the pipe bedding to an in-place density of at least 90 percent of the maximum dry density as <br /> determined using ASTM D-1557. Properly prepared backfill, greater than 2 feet above the pipe <br /> bedding, should be placed in uniform loose lifts not to exceed 12 inches and densely compacted <br /> in a systematic manner using appropriately sized compaction equipment to achieve at least 95 <br /> percent of the maximum dry density as determined using ASTM D-1557. Smaller loose lifts <br /> may be necessary to achieve compaction where hand held compaction equipment such as <br /> jumping jacks, or plate compactors are used. Please note that based on our previous laboratory <br /> testing, if LPSB is used at a ga.s barrier, at least 3 feet of this material compacted to at least 95% <br /> of the maximum dry density, obtained by ASTM D1557, is required. <br /> 0•0 <br /> If you have any questions or require additional information, please contact the undersigned at <br /> your earliest convenience at (425) 774-0106. <br /> HWA GEOSCIENCES INC. <br /> �G F\,VASti/jy <br /> * ,`k's" cr'-• C,o <br /> cn r . a <br /> '53 ..-:;#11:7 <br /> ..."" ".54wr„,....4.;,,,, y-d______...,,, T---- <br /> Exr 9-11-2o <br /> Michael Place, P.E. 7.3-11 <br /> Senior Geotechnical Engineer <br /> Riverfront Boulevard Addendum 2 3 HWA GeoSciences Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.