March 26, 2019 <br /> HWA Project No. 2015-061-21 Task 600-7 <br /> the east of the landfill site. However, our analysis suggests that neither flow sliding or lateral <br /> spreading is expected to extend to the alignment of Riverfront Boulevard. As such we do not <br /> expect flow sliding or lateral spreading to be a design concern for the Riverfront Boulevard <br /> project. <br /> Lateral spread evaluations were completed using Washington State Department of Transportation <br /> (WSDOT)procedures utilizing the computer program Slide 5.0. The geometry of the of <br /> liquefiable soil along cross sections C-C' and D-D', utilized in the lateral spread analysis, are <br /> shown in Figures 4C and 4D. As indicated in Section 4.2.2, these cross sections assume that the <br /> refuse is not liquefiable during the design earthquake. These analyses indicate that lateral <br /> spreading and flow sliding are limited to areas east of the existing leachate collection trench. <br /> For a previously planned development at the site, HWA completed additional lateral spread <br /> analysis along cross sections C-C' and D-D', assuming saturated portions of the refuse liquefy <br /> during the design earthquake, to estimate maximum anticipated lateral spread displacements. <br /> Anticipated levels of displacement were evaluated using equations outlined in Bray and <br /> Travasarou(2007). These analyses indicated that even with portions of the refuse undergoing <br /> liquefaction, anticipated displacements along Riverfront Boulevard would be limited to less than <br /> 2-inches under the 1033 year design earthquake. Hence, even with the conservative assumption <br /> that portions of the refuse will liquefy during the design earthquake, the anticipated levels of <br /> displacement(less than 2-inches) are below a level that would result in a threat to life safety of <br /> the traveling public. It should also be noted that these analyses did not take into account the <br /> increased resistance to lateral spreading that would occur due to the driving of pile foundations <br /> associated with the future phases of development east of Riverfront Boulevard. The presence of <br /> future pile foundations would be expected to further reduce anticipated displacements. <br /> Therefore, based on our analysis, we do not expect lateral spreading to be a design concern for <br /> Riverfront Boulevard. <br /> 4.2.5 Near Fault Hazards <br /> The site is located 5 miles from the northernmost fault in the Southern Whidbey Island Fault <br /> Zone. The Southern Whidbey Island Fault Zone consists of late Quaternary Reverse Faults with <br /> slip rates on the order of 0.2 to 1 mm per year. Due to the site's proximity to these active faults, <br /> the site is likely to experience large accelerations. The large ground motions are included in the <br /> design parameters and therefore will be incorporated into the design. Near fault ground motions <br /> also have the potential to exhibit forward directivity, which results in a strong pulse of <br /> acceleration at longer structural periods. As the Riverfront Boulevard project does not include <br /> any structures, forward directivity is not a design concern. <br /> 111 4.2.6 Ground Rupture <br /> Ground rupture can occur when a fault extends up to the ground surface. Based on a review of <br /> the United States Geological Survey Fault Database, the closest fault to the site is the <br /> northernmost fault in the Southern Whidbey Island Fault Zone, which is approximately 5 miles <br /> southeast of the site. As a result, HWA believes that site has a low potential for ground rupture. <br /> Geotechnical Report Revision 3 26 2019.doc 11 HWA GEOSCIENCES INC. <br />