Laserfiche WebLink
I <br /> March 26, 2019 <br /> H WA Project No. 2015-061-21 Task 600-7 <br /> compaction should only be attempted during the dry summer months. Other types of gas'barrier <br /> should be installed in areas requiring construction outside of the dry summer months. <br /> If the above-mentioned approved LPSB stockpile is not sufficient quantity to meet the project <br /> LPSB needs, laboratory testing will be required to verify that either imported or in-place LPSB <br /> meets the intent of the material. For imported LBSB, we recommend that the proposed source <br /> location be tested and approved prior to importation of LPSB material. The testing protocol and <br /> frequencies for proposed imported LPSB are provided in Table 4. If the in-place soils are to be <br /> used as LPSB, testing along the roadway will be required to verify that the soils meet the intent <br /> of LPSB and are compacted to a sufficient level to achieve a permeabilityof l x 10-5 cm/sec or <br /> p <br /> less. The testing protocol and frequencies for in-place soils to be used as LPSB are provided in <br /> Table 4. <br /> Table 4 <br /> LPSB Testing Requirements <br /> Required Material Testing Frequencies <br /> Imported In Place <br /> Test Designation Low Permeability Soil Barrier Low Permeability Soil Barrier <br /> (LPSB) (LPSB) <br /> Density Test(ASTM Not Applicable 1 test every 200 feet of roadway <br /> * <br /> D 6938) <br /> Gradation 3 initial tests for evaluation by 1 test every 200 feet of roadway* <br /> (ASTM D 422) the Engineer prior to placement <br /> Moisture/Density 3 initial tests for evaluation by 1 test every 200 feet of roadway* <br /> i (ASTM D 1557) the Engineer prior to placement <br /> Hydraulic 1 initial test on a remolded 1 test every 200 feet of roadway on <br /> Conductivity composite sample, at 1 to 3 a remolded composite sample, at 1 <br /> (ASTM D 5084) percent over optimum moisture to 3 percent over optimum <br /> content, and compacted to 93% moisture content, and compacted <br /> of the uncorrected laboratory to the level determined through <br /> maximum drydensity, densitytestingat the subject <br /> J <br /> determined by ASTM D 1557 location* <br /> Moisture Content Daily as processed <br /> (ASTM D 2216) <br /> * Samples and compaction testing of in place soils to be obtained at the approximate midpoint of <br /> the existing layer. <br /> Y <br /> I <br /> Geotechnical Report Revision 3 26 2019.doc 23 HWA GEOSCIENCES INC. <br />