My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD Geotech Report 2023-05-04
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
Geotech Report
>
3800 RIVERFRONT BLVD Geotech Report 2023-05-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2023 8:10:16 AM
Creation date
5/4/2023 7:16:17 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 26, 2019 <br /> HWA Project No. 2015-061-21 Task 600-7 <br /> (WAC) 296-155, latest revisions, all temporary cuts more than 4 feet in height must be either <br /> sloped or shored prior to entry by personnel. The existing near surface fill and refuse are <br /> generally classified as Type C soils per WAC 296-155. Where shoring is not used, temporary <br /> cuts in Type C soils should be sloped no steeper than 1%2H:1 V. <br /> 5.0 CONDITIONS AND LIMITATIONS <br /> We have prepared this report for Shelter Holdings their client and agents for use in design and <br /> construction of Riverfront Boulevard. The conclusions and interpretations presented in this <br /> report should not be construed as a warranty of the subsurface conditions. Experience has shown <br /> that soil and ground water conditions can vary significantly over small distances. Inconsistent <br /> conditions can occur between explorations and may not be detected by a geotechnical study of <br /> this scope and nature. If, during future site operations, subsurface conditions are encountered <br /> which vary appreciably from those described herein, HWA should be notified for review of the <br /> recommendations of this report, and revision of such if necessary. <br /> We recommend HWA be retained to review the plans and specifications to verify that our <br /> recommendations have been interpreted and implemented as intended. Sufficient geotechnical <br /> monitoring, testing, and consultation should be provided by HWA during construction to confirm <br /> the conditions encountered are consistent with those indicated by the explorations, to provide <br /> recommendations for design changes should conditions revealed during construction differ from <br /> those anticipated, and to verify that the geotechnical aspects of construction comply with the <br /> contract plans and specifications. <br /> Within the limitations of scope, schedule and budget, HWA executed these services in <br /> accordance with generally accepted professional principles and practices in the fields of <br /> geotechnical engineering and engineering geology in the area at the time the report was prepared. <br /> No warranty, express or implied, is made. <br /> HWA does not practice or consult in the field of safety engineering. We do not direct the <br /> contractor's operations and cannot be responsible for the safety of personnel other than our own <br /> on the site. As such, the safety of others is the responsibility of the contractor. The contractor <br /> should notify the owner if any of the recommended actions presented herein are considered <br /> unsafe. <br /> O.O <br /> Geotechnical Report Revision 3 26 2019.doc 26 HWA GEOSCIENCES INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.