Laserfiche WebLink
March 26, 2019 <br /> HWA Project No. 2015-061-21 Task 600-7 <br /> (WAC) 296-155, latest revisions, all temporary cuts more than 4 feet in height must be either <br /> sloped or shored prior to entry by personnel. The existing near surface fill and refuse are <br /> generally classified as Type C soils per WAC 296-155. Where shoring is not used, temporary <br /> cuts in Type C soils should be sloped no steeper than 1%2H:1 V. <br /> 5.0 CONDITIONS AND LIMITATIONS <br /> We have prepared this report for Shelter Holdings their client and agents for use in design and <br /> construction of Riverfront Boulevard. The conclusions and interpretations presented in this <br /> report should not be construed as a warranty of the subsurface conditions. Experience has shown <br /> that soil and ground water conditions can vary significantly over small distances. Inconsistent <br /> conditions can occur between explorations and may not be detected by a geotechnical study of <br /> this scope and nature. If, during future site operations, subsurface conditions are encountered <br /> which vary appreciably from those described herein, HWA should be notified for review of the <br /> recommendations of this report, and revision of such if necessary. <br /> We recommend HWA be retained to review the plans and specifications to verify that our <br /> recommendations have been interpreted and implemented as intended. Sufficient geotechnical <br /> monitoring, testing, and consultation should be provided by HWA during construction to confirm <br /> the conditions encountered are consistent with those indicated by the explorations, to provide <br /> recommendations for design changes should conditions revealed during construction differ from <br /> those anticipated, and to verify that the geotechnical aspects of construction comply with the <br /> contract plans and specifications. <br /> Within the limitations of scope, schedule and budget, HWA executed these services in <br /> accordance with generally accepted professional principles and practices in the fields of <br /> geotechnical engineering and engineering geology in the area at the time the report was prepared. <br /> No warranty, express or implied, is made. <br /> HWA does not practice or consult in the field of safety engineering. We do not direct the <br /> contractor's operations and cannot be responsible for the safety of personnel other than our own <br /> on the site. As such, the safety of others is the responsibility of the contractor. The contractor <br /> should notify the owner if any of the recommended actions presented herein are considered <br /> unsafe. <br /> O.O <br /> Geotechnical Report Revision 3 26 2019.doc 26 HWA GEOSCIENCES INC. <br />