Laserfiche WebLink
I <br /> Soil boring cuttings were placed in plastic-lined 1-cubic yard heavy cardboard boxes, nailed to <br /> wood pallets. These were wrapped and sealed in Visqueen plastic sheeting and subsequently <br /> buried on site in the landfill by JR Hayes under contract to Shelter Holdings. I <br /> Upon completion, each borehole was abandoned in accordance with Department of Ecology <br /> requirements. Bentonite grout was mixed and pumped into each boring. Typically, the grout <br /> settled several feet, such that on a subsequent day each borehole was topped off to the ground <br /> surface with bentonite chips. <br />