Laserfiche WebLink
• - • il <br /> r <br /> PRE-INSTALLATION COMPONENTS <br /> O Verify module compatibility. See Page 21 for info. <br /> TOOLS REQUIRED <br /> ❑ Cordless Drill(non-impact) ❑ 1/8"Drill bit <br /> ❑ Impact Driver(for lag bolts) ❑ 1/4"Drill bit <br /> XR Rail Wire Clip BOSS <br /> ❑ Torque Wrench(0-250 in-lbs) ❑ T30 Torx Bit <br /> ❑ 7/16"Socket ❑ Channel Lock Pliers <br /> ❑ 1/2"Socket ❑ #3 Phillips Bit d5 ® #;�' <br /> ❑ 9/16"Socket ❑ Paddle Bit <br /> UFO and Stopper Ironridge L-Foot and <br /> ❑ 7/32"Drill bit Sleeve(30-46MM) CAMO OM L-Foot <br /> Lug <br /> BONDING HARDWARE TORQUE VALUES <br /> Please refer to each attachment's individual section for full details <br /> on all torque values and instructions. <br /> End Cap Rail Grounding Lug Module Grounding <br /> ❑ Universal Fastening Object(7/16"Socket):80 in-lbs Lug <br /> ❑ Rail Grounding Lug Nut(7/16"Socket):80 in-lbs <br /> ❑ Module Grounding Lug Nut(7/16"Socket):60 in-lbs <br /> ❑ Grounding Lug Terminal Screws(7/16"Socket):20 in-lbs <br /> ❑ Expansion Joint Nuts(7/16"Socket):80 in-lbs Microinverter Kit 3/8"Bonding 8"Bonding Jumper <br /> Hardware <br /> ElMicroinverter Kit Nuts(7/16"Socket):80 in-lbs Single Use Only <br /> ❑ Frameless Module Kit Nuts(7/16"Socket):80 in-lbs <br /> ❑ 3/8"Bonding Hardware Nuts(7/16"Socket):250 in-lbs <br /> a <br /> ❑ Contour Clamp(T-30 Torx Bit):80 in-lbs <br /> OM Classic Conduit JAYBOX Expansion Joint <br /> Comp Mount <br /> QM Tile Conduit Frameless Frameless Module Kit <br /> Mount End/Mid Clamp <br /> Unless otherwise noted,all components have been evaluated for <br /> multiple use.They can be uninstalled and reinstalled in the same Contour Trim Contour Clamp <br /> or new location. <br /> o - • . • FLUSH MOUNTINSTALLATION <br />