Laserfiche WebLink
. IL-4111111Pr il <br /> EM <br /> r <br /> The general installation method for attachments is to <br /> locate a rafter, drill a pilot hole and install the attachment. <br /> For composition roof attachments installation instructions e <br /> refer to page 10. For tile roof attachments refer to page , <br /> 12. For low slope roof attachments refer to page 14. <br /> When using approved third party attachments, refer to <br /> manufacturer's install instructions. IT <br /> Tested or evaluated third-party roof attachments: e <br /> • S-5!Standina Seam Metal Roof Clamps-Certification of metal <br /> roof clamps includes bonding to both painted and galvalume <br /> metal roofs.Tighten S-5!and S-5! Mini set screws to 130-150 in-lbs(>-24 gauge)or 160-180 in-lbs(22 gauge)roofs.Tighten S-5! M10 bolt <br /> to 240 in-lbs or S-5!Mini M8 bolt to 160 in-lbs.Use the following fastening guidelines for other S-5! roof clamps: ProteaBracketTM -firmly <br /> seat roof screws and tighten hinge bolt to 225 in-lbs; RibBracketTM -firmly seat roof screws and tighten M8 bolt(M8-1.25 x 22mm sold <br /> separately)to 160 in-lbs;and SolarFootTM -firmly seat roof screws and tighten M8 flange nut to 160 in-lbs. <br /> • EcoFasten Green Fasten GF-1 Anchors <br /> PLACE <br /> A. CONNECT SPLICES A Boss <br /> Use BOSS(Bonded Structural Splice),as needed,to join multiple sections of Rail. <br /> BOSS-Bonded Structual Splice <br /> Insert BOSS into first Rail up until the Stop Tab. Slide second Rail fully into place. <br /> Insert Rail until)fully seated <br /> Rows using BOSS and exceeding 100 feet of Rail must use Expansion Joints. against stop Tab <br /> D Boss Splices may be installed in any location within a span. <br /> UFO and Bonding Hardware must be installed 1"away from the point where <br /> two Rails join together. <br /> B <br /> B. PREPARE HARDWARE <br /> Slide square-headed bolts into side-facing rail slot.Space out bolts to match <br /> attachment spacing. <br /> Tape ends of rail,to keep bolts from sliding out while moving. Preload and space <br /> If using T-bolts,carry hardware onto roof and proceed. square Bolts <br /> C.ATTACH RAILS <br /> Ci > °,. Torque to <br /> Drop rail with hardware into roof attachment.Level rail at desired height,then torque to ie° 250 in-lbs <br /> 250 in-lbs. <br /> D Rail can face either upslope or downslope on roof. a � <br /> D When using attachments with longer slots,do not install Rail lower than the <br /> top of the L-Foot to avoid damage to modules. <br /> o 2022 IRONRIDGE, • • INSTALLATION <br />