Laserfiche WebLink
MOT Mr9V1qEEYW 0006 <br /> Expansion Joints are required every 100'of continuous rail to allow for thermal expansion and contraction of the system. <br /> Do not install modules over expansion joint. <br /> BOSS <br /> Insert BOSS into first Rail up to the Alignment Circle, Slide No Modules Over Gap <br /> second Rail over BOSS to the second Alignment Circle, <br /> leaving a 1" gap between the Rails. ,o <br /> There must be a 1"of space between the edge of the Rail <br /> and the edge of the panel to allow proper installation of the <br /> UFO and Stopper Sleeve. <br /> O O <br /> One Bonding Strap Per Break In <br /> Array <br /> `77c �.1"Gap Alignment <br /> Circles <br /> No Modules Over Gap <br /> No Bonding Strap required for <br /> BOSS <br /> o 2022 IRONRIDGE, • • INSTALLATION <br />