My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2602 81ST PL SE 2023-06-20
>
Address Records
>
81ST PL SE
>
2602
>
2602 81ST PL SE 2023-06-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2023 9:42:04 AM
Creation date
5/9/2023 9:21:07 AM
Metadata
Fields
Template:
Address Document
Street Name
81ST PL SE
Street Number
2602
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cc: Planning Email <Planning@everettwa.gov> <br /> Subject: RE: [EXTERNAL] Re: PW2208-006, 2602 81st PI SE, Everett <br /> Hi Thad. can you help me with page 19 of the small project plan. I'm not sure what to put for category 2 <br /> and 3. <br /> Category 2 about roofs does not seem applicable to my project because I am not changing anything with <br /> the roof it will be draining into the downspouts leading to the street drain.The pavers will have a French <br /> drain leading to the downspout drain as some on the site plan. <br /> Thanks! <br /> Sent from Yahoo Mail on Android <br /> On Tue, Aug 16, 2022 at 2:34 PM, Eli Warner <br /> <ewarner9gyahoo.com> wrote: <br /> Thanks Thad. I will start working on the small project storm water report. <br /> Sent from Yahoo Mail on Android <br /> On Tue, Aug 16, 2022 at 1:41 PM, Thad Newport <br /> <TNewportga everettwa.gov>wrote: <br /> Eli, <br /> The Geotech assessment would be a requirement by the planning department. I have copied them on <br /> this email to weigh in. <br /> The driveway can be a maximum of 30-feet wide within the first 20-feet of your property. It looks like <br /> your proposed paver work exceeds that max. width based on the scales shown. Yes,the driveway apron <br /> could be included in this PW permit and just needs to be shown on the scope of work. <br /> Public Works would still need the Small Project Stormwater Site Plan/Report filled out since this exceeds <br /> 2,000 SF of new/replaced hard surface area.The site plan should also show the location of the proposed <br /> catch basin, the catch basin you are connecting to in the street and the type of pipe being used. <br />
The URL can be used to link to this page
Your browser does not support the video tag.