Laserfiche WebLink
_ P."4eqo Thad Newport <br /> Associate Engineer I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett, WA 98201 <br /> EVERETT 'W.50 ' Phone Hours: M/W/Th: 8 a.m.—12 p.m & 1 p.m.—3 p.m. <br /> everettwa.gov/permits I Facebook I Twitter <br /> Note: Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant <br /> to the Public Records Act. <br /> From: Eli Warner<ewarner9@yahoo.com> <br /> Sent:Tuesday, August 16, 2022 12:03 PM <br /> To:Tawnya Herman <THerman@everettwa.gov> <br /> Cc:Thad Newport<TNewport@eve rettwa.gov> <br /> Subject: [EXTERNAL] Re: PW2208-006, 2602 81st PI SE, Everett <br /> CAUTION: This email originated from outside of the organization. Do not click links or open attachments <br /> unless you recognize the sender and know the content is safe. <br /> spoke with a geotech engineer and he recommended taking the runoff to the street. I <br /> hired a plumber to connect our downspouts to the street and provide a catch basin on <br /> the SW side of the house for us to put all the new paver runoff in. I attached a site plan <br /> with that shown. <br /> Since we are disturbing the concrete at the apron, I am interested in widening the apron <br /> by two sidewalk panels as shown in the site plan. Could that work be done under this <br /> permit also? <br /> I'm assuming I don't need the geotech assessment since we are bringing all the runoff <br /> to the street. Please let me know if you need a new permit application or if PW2208- <br /> 006 will work for the pavers and the apron. <br /> Thank you, <br /> Eli Warner 801-680-5942 <br /> On Wednesday, August 10, 2022 at 03:01:51 PM PDT, Tawnya Herman <therman(c�everettwa.gov> <br /> wrote: <br /> Eli— <br />