Laserfiche WebLink
LIVE design group <br /> er � <br /> ROBISON <br /> ENGINEERING,INC <br /> 00000p0 <br /> ,ti s <br /> o — <br /> p <br /> a 0 <br /> �C70a00011��2p22 <br /> 1 <br /> N <br /> C-4 <br /> L O <br /> CD-1 C"! <br /> 600 ` N <br /> ACT-1 tt <br /> W •''V=^3 <br /> ) co <br /> >1 CN <br /> N <br /> N � rn N <br /> oo' GENERAL NOTES00 <br /> OL <br /> 2 4 U _ _ <br /> 1. MOUNT ALL REMOTE THERMOSTATS AT 48" AFF041 <br /> ID ti <br /> ACT-16 1 17 WSHP-4 2. EXHAUST SHALL BE MIN. 3' FROM OPENINGS AND s. O <br /> CD-1 10' FROM MECHANICAL INTAKES. j > <br /> 11�50 200 3. PLAN DOES NOT DEPICT ALL EXISTING LULL.I <br /> RG-1 ACT-1 <br /> G ACT-1 CONDITIONS. MISSING INFORMATION MAY INCLUDE LLI <br /> FANS, AIR HANDLERS, DUCTWORK AND OTHER C/) <br /> N EQUIPMENT. FIELD VERIFY CONDITIONS PRIOR TO O <br /> BID. _ <br /> 4. ALL DUCTS SHALL BE SUPPORTED PER LATEST •V O <br /> SMACNA RECOMMENDATIONS FOR SEISMIC L <br /> RG-1 <br /> CBT-9 SUPPORT. <br /> 400 5. CONTRACTOR SHALL FURNISH AND INSTALL <br /> 120 150 MAINTENANCE LABELS ON ALL NEW EQUIPMENT. Q <br /> e 6. ALL EQUIPMENT AND WIRING SHALL COMPLY WITH <br /> LOCAL AND STATE CODES. <br /> CD-1 7. ALL EQUIPMENT SHALL BE ANCHORED TO THE <br /> 500 ACT-1 BUILDING STRUCTURE. <br /> a <br /> CD-1 8. CONTRACTORS SHALL FIELD VERIFY SITE <br /> ACT-1 2 4 150 CONDITIONS PRIOR TO FABRICATION OF DUCT <br /> 4f SYSTEMS VERIFY DUCT SPACE AVAILABLE AND <br /> 8 ANY POSSIBLE CONFLICTS DUE TO PLUMBING AND <br /> OTHER STRUCTURAL CONDITIONS. <br /> 20 5001 yy HP_3 8x18 160 9. MECHANICAL SYSTEMS SHALL BE PROVIDED AND <br /> INSTALLED IN COMPLIANCE WITH THE <br /> RECOMMENDATIONS CONTAINED IN LOCAL <br /> 500' BUILDING CODES. <br /> 0Mimi I 07/28/2022 <br /> RG-1 <br /> FLAG NOTES CONSTRUCTION <br /> A -1 ACT-, DOCUMENTS I <br /> i1 RG—1 80 1. PROVIDE 7—DAY PROGRAMMABLE THERMOSTAT. J <br /> CD—1 D- <br /> 2. FAN COIL LOCATED ABOVE CEILING. SUSPEND UNIT FROM <br /> 150 CD-1 5 STRUCTURE. MOUNT UNIT TO MAINTAIN REQUIRED CLEARANCES <br /> 500 � AROUND UNIT FOR MAINTENANCE PURPOSES. TIE INTO <br /> ACT-1 )KIN <br /> EXISTING CONDENSATE LINES. <br /> CD— <br /> Revisions <br /> 100 2 3. EXISTING OUTSIDE AIR SUPPLY FAN TO REMAIN. <br /> 0o No. Description Date <br /> RG-1 N YJ 1 RG-1 RG-1 4. CONNECT HYDRONIC FAN COIL TO EXISTING WATER LINES. 0 100%SUBMITTAL 7/28/22 <br /> 2 REVISIONS 11/17/22 <br /> Q� 5. PROVIDE RETURN AIR PLENUM RETURN GRILLE. REFER TO <br /> DETAIL 3/M3.0 (TYP). <br /> 6. OSA SUPPLY IN PLENUM CEILING. BALANCE TO 410 CFM. <br /> 1 4 1 4 160 17x1 WS P-2 CONTRACTOR TO CONTACT ENGINEER IF EXISTING SUPPLY FAN <br /> ",:�• 21 DOES NOT MEET REQUIRED CFM. <br /> ' l nki0 <br /> •:®.:• ti®: ��� 200 � — <br /> ,r CD-1 CD-1 <br /> 1 <br /> 400 400 <br /> PCT-1 <br /> / GD-1 <br /> / 100 H <br /> ALT11 2 <br /> 115D <br /> WSHP160 <br /> American Red <br /> Rc-, RG-1 Cross: Everett,WA <br /> Owner <br /> 1010 SE Everett Mall Way <br /> HVAC PLAN N Everett, 56``8202 <br /> WA 98028 <br /> SCALE: 1/4" = 1'—O" <br /> Project Number <br /> 22001 D <br /> Dale <br /> 11/17/2022 <br /> HVAC PLAN <br /> M2. 1 <br /> This drawing is the property of LIVE design group pc,and is not to be reproduced,copied,or altered in whole or in part or used for any purpose without the approval of LIVE design group pc,and is to be returned upon request. 331 p205.870.30901 f205.870.30931 www.LlVEdesigngroup.com 7/26/20224:30:20 PM <br />