Laserfiche WebLink
GENERAL NOTES: <br />1. COORDINATE TRANSFORMER INSTALLATION WITH SNOPUD. <br />MAKE ALL CONNECTIONS, ETC. REQUIRED BY SNOPUD. <br />COORDINATE SCHEDULING WITH SNOPUD AND OWNER. <br />2. PEDESTAL AND CHARGER BY OWNER. COORDINATE <br />INSTALLATION PER MANUFACTURER'S REQUIREMENTS, AND <br />PROVIDE ALL ASSOCIATED MOUNTING ACCESSORIES & <br />SUPPORT. <br />3. PROVIDE COMMISSIONING, STARTUP, PROGRAMMING, AND <br />TESTING FOR CHARGERS. COORDINATE REQUIREMENTS <br />WITH MANUFACTURER. <br />DETAIL NOTES: <br />NEW UTLITY CO. PRIMARY FEEDERS IN EXISTING 1-4" CONDUIT <br />TO NEW TRANSFORMER - BY SNOPUD. <br />2D PROVIDE NEW CTIMETER, 400A DISCONNECT SWITCH (300A <br />FUSES), AND 400 AMP TEMP PANEL ON GALVANIZED STEEL <br />CHANNEL FRAME. GROUND PER NEC. <br />3D PROVIDE 9 #6 Cu, 1 #10 GND (CONDUCTORS DE -RATED TO 70% <br />PER NEC 310,15) IN EXISTING 2"C TO EV PEDESTALS THROUGH <br />EXISTING J-BOX. SEPARATE #10Cu GND AT J-BOX TO FEED <br />EACH PEDESTAL. TYPICAL OF 5. <br />4� NEW BUS CHARGING PEDESTAL/STATION, OWNER PROVIDED <br />CONTRACTOR INSTALLED ON EXISTING PAD, AND PROVIDE ALL <br />CONNECTIONS. TYPICAL OF 14. <br />J <br />r <br />IYI' of <br />(3) EXIS-. <br />k1T <br />FOR 8 FUTURE <br />. <br />BUS CHARCERL <br />-NO WCPF: <br />,. <br />T J <br />--'''' <br />PHASEII- <br />j' "- <br />II I{hi <br />11 CHARGERS <br />II <br />I� I <br />Ij I v Ij <br />II <br />Ij #s <br />� <br />Ij I <br />NEW BUS CHARGING -1 <br />Z5 <br />PEDESTAL izTATEiN � <br />m <br />Ij <br />Cn <br />ICIa4 <br />(E) UTILITY CO <br />IfG <br />NEW BUS CHARGING <br />POLE <br />�. I <br />PEDESToE %ST .TICS, <br />I II <br />I� I <br />LI <br />TEMP PANEL a2 <br />DISC SW <br />METERICT <br />j _- NEW UTILITY CO.a <br />I4�_TRANSFORMER 1 <br />D <br />r <br />m <br />W <br />rWA <br />Electrical Consultants, Inc. <br />19015 36th Avenue West, Suite E <br />Lynnwood, Washington 98036 <br />Phone (425) 775-1799 FAX (425( 774-9870 <br />EPS BUS GARAGE — <br />DC BUS CHARGING <br />STATIONS <br />PHASE <br />EPS BUS GARAGE <br />2911 CALIFORNIA ST. <br />EVERETf, WA 98201 <br />Mo. DATE REMslary <br />DR�CC 9p:EFnl 21135)cHEc'm BY <br />ELECTRICAL SITE <br />PLAN <br />.RUIT Mo <br />DAIS <br />MARCH 03, 2023 <br />SNEEi uuMBER <br />E 1.00 <br />www. sleceom @ AWA, INC <br />