Laserfiche WebLink
EXiS- <br />1 EQUIPMENT <br />EXIST <br />EQUIPMENT-5 <br />EXIST <br />EQUIPMENT <br />RTu-a <br />EXIST <br />EQUIPMENT <br />EXISq EXIST <br />EQUIPMENT EQUIPMENT <br />EaEXIST <br />EQUIPMENT <br />DEMO EXIST UNIT <br />(TYR 6) <br />RTU-1 <br />RTU-2 <br />a <br />oM <br />PARTIAL ROOF DEMO PLAN - HVAC <br />SCALE: 1/8" = V-0" <br />GSEYE?AL NOTES: <br />REPLACEMENT OF EXISTING UNIT WITHOUT SCREENING. NO NEW <br />SCREENING REQUIRED. <br />3D AERIAL VIEW - HVAC <br />SCALE: NONE <br />BLDG OUTLINE <br />EXISTING 48" PARAPET <br />WALL, TYPICAL ON ALL <br />SIDES OF BLDG <br />EXIST <br />EQUIPMENT <br />_. =plT RTU-5 <br />r EXIST <br />+ EQUIPMENT Fj F*7 <br />I�j�/I Rru-a <br />EXIST <br />EQUIPM5T <br />�XIFSqT <br />EXIST <br />EQUIPMENT <br />EQUIPMENT <br />[I 1� <br />ExlsT RTD e <br />EQUIPMENT <br />EaEXIST <br />EQUIPMENT <br />REPLACE EXIST UNIT W/ NEW UNIT, OF <br />THE SAME CAPACITY. RE -CONNECT TO <br />EXIST DUCTWORK & UTILITIES, SEE <br />EQUIPMENT SCHEDULE FOR DETAILS ON <br />NEW UNIT (TYR 6) <br />EXISTING 48" PARAPET <br />WALL, TYPICAL ON ALL <br />SIDES OF BLDG <br />RIU-1 <br />a <br />oM <br />PARTIAL ROOF PLAN - HVAC <br />SCALE 1/8' 0" <br />3 <br />Hermanson <br />Building Today, Defining Tomorrow <br />Hermanson Company LLP <br />1221 2nd Avenue North <br />Kent, Washington 98032 <br />Tel: (206) 575-1700 <br />Fax:(206) 575-9800 <br />-.hermanson.com <br />Contractor Reg g: HERMACLO05BJ <br />RTU <br />REPLACE <br />EVERETT MALL PLAZA, SUITE C <br />1321 SE EVERETT MALL WAY <br />EVERETT, WA 98208 <br />NNgODOR N <br />gc`00 F wnsy7�Fy,�2 <br />� �• NE1 OT � <br />_ 6149 <br />�yQ <br />'1 (N�'I40iNAL 6C� <br />t r DECEMBER 3, 2022 <br />ISSUE FOR PERMIT <br />OUILME •- ♦ Revisions <br />a <br />oM <br />= KEY PLAN - - <br />SCAI F. NOT TO SCAI F - <br />HEAT PUMP <br />SCHEDULE - DEMO LAST UPDATED: 92922 <br />UNIT <br />TAG <br />LOCATION <br />SERVES <br />BASIS OF <br />DESIGN <br />SUPPLY <br />CFM <br />OSA RETURN <br />CFM CFM <br />ESP <br />IN WG <br />COOLING <br />CAPACITY <br />MBH <br />HEATING <br />CAPACITY <br />MBH <br />(UNO) <br />ELECTRICAL <br />SOUNC <br />IDEA <br />NEIGHT <br />LBS <br />REMARKS <br />TOTAL <br />SENS <br />SEER <br />EER <br />TOTAIC <br />HSPF <br />COP <br />BACKUPKA <br />HP <br />I MCA <br />I V/PH <br />RTU-1 <br />ROOF <br />TENANT SPA <br />CARRIER S03SO60 <br />2,000 <br />300 1,700 <br />0.50 <br />60 <br />40 <br />- <br />60 <br />- <br />- <br />208 1 <br />1 <br />RTU-2 <br />ROOF <br />TENANT SPA <br />RIER OYQQ48311 <br />1,600 <br />240 1,360 <br />0.50 <br />48 <br />32 <br />48 <br />208111 <br />1 <br />RTU-3 <br />ROOF <br />TENANT SPAM <br />TRANE WSC036E <br />1,200 <br />180 1,020 <br />0.50 <br />36 <br />24 <br />36 <br />208 1 <br />1 <br />RTU4 <br />ROOF <br />TENANT SPACE <br />TRANE WSCO42F <br />1,400 <br />210 1,190 <br />0.50 <br />42 <br />28 <br />42 <br />208 1 <br />1 <br />RTU-S <br />ROOF <br />rENANT SPA <br />TRANS WSCO60A <br />2,000 <br />300 1,700 <br />0.50 <br />60 <br />40 <br />60 <br />208 1 <br />1 <br />RTU-6 <br />ROOF <br />rENANT SMqFARRIER <br />50Y 02431 <br />800 <br />120 680 <br />0.50 <br />24 <br />16 <br />24 <br />208 1 <br />1 <br />GtNtHAL ALL I KAUtS I U CUNFIKM tQU1PMtN I REQtL U1KtMtN 15 (tC1 H1LAL, W t1GH I , 51Lt, It C...) W11 H APPKUVLU SUBMI I I ALS MUK I U 1N51 AUAI 1UN; F1tLU L.0It F UKUINAI INAL LULA I ION tk <br />INSTALL PER MANUFACTURERS REQUIREMENTS <br />GENERAL UNIT CAPACITY RATED AT 8S/67 OUTSIDE AIR DESIGN TEMPERATURES <br />1 DEMO <br />HEAT <br />PUMP SCHEDULE LAST UPDATED: 92922 <br />UNIT <br />TAG <br />LOCATION <br />BASIS OF <br />SERVES DESIGN <br />SUPPLY <br />CFM <br />OSA <br />CFM <br />RETURN <br />CFM <br />ESP <br />IN WG <br />COOLING <br />CAPACITY <br />MBH <br />HEATING <br />CAPACITY <br />MBH <br />ONO <br />ELECTRICAL <br />SOUN <br />DBA <br />EIGHT <br />LEIS <br />REMARKS <br />TOTALSENS <br />SEER <br />EER <br />TOTA <br />HSPF <br />COP <br />BACKUP <br />HP <br />MCA <br />V/PH <br />RTU-1 <br />ROOF <br />ENANT SPAC ER 5OGC MO <br />2,000 <br />300 <br />1,700 <br />0.90 <br />61 <br />47 <br />16.2 <br />54 <br />8.9 <br />3.8 <br />15.0 <br />0.80 <br />48 <br />208 1 <br />79 <br />596 <br />14 6-10 12-17 <br />RTU-2 <br />ROOF <br />ENANT SPAC ER 50GC MOS <br />1,600 <br />240 <br />1,360 <br />0.90 <br />49 <br />37 <br />16.2 <br />46 <br />8.7 <br />3.7 <br />11.9 <br />0.80 <br />98 <br />208 1 <br />79 <br />610 <br />1-11 14-17 <br />RTU-3 <br />ROOF <br />ENANT SPAC CARRIER 50FC A04 <br />1,200 <br />180 <br />1,020 <br />0.90 <br />37 <br />28 <br />14.3 <br />34 <br />8.2 <br />3.7 <br />6.5 <br />0.55 <br />66 <br />208 1 <br />75 <br />487 <br />1-11 14-17 <br />RTU4 <br />ROOF <br />TENANT SPAC CARRIER SOFC A04 <br />1,200 <br />210 <br />990 <br />0.90 <br />37 <br />28 <br />14.3 <br />34 <br />8.2 <br />3.7 <br />6.5 <br />0.55 <br />66 <br />208 1 <br />75 <br />487 <br />1-11 14-17 <br />RTU-5 <br />ROOF <br />TENANT SPAC ER SOGC M06 <br />2,000 <br />300 <br />1,700 <br />0.90 <br />61 <br />47 <br />16.2 <br />54 <br />8.9 <br />3.8 <br />15.0 <br />0.80 <br />48 <br />208 1 <br />79 <br />596 <br />14 6-10 12-17 <br />RTU-6 <br />ROOF <br />TENANT SPAC CARRIER SOVTL24 <br />800 <br />120 <br />680 <br />0.20 <br />23 <br />18 <br />14.5 <br />23 <br />8.0 <br />5.0 <br />0.24 <br />44 <br />208 1 <br />74 <br />311 <br />1-il 14-17 <br />GENERAL ALL TRADES TO CONFIRM EQUIPMENT REQUIREMENTS (ELECTRICAL, WEIGHT, SIZE, ETC ..J WITH APPROVED SUBMITTALS PRIOR TO INSTALLATION; FIELD COORDINATE FINAL LOCATION & <br />INSTALL PER MANUFACTURERS REQUIREMENTS <br />GENERAL UNIT CAPACITY RATED AT 85/67 OUTSIDE AIR DESIGN TEMPERATURES <br />1 ELECTRICAL CONTRACTOR TO PROVIDE SCCR PROTECTION DIRECTION FOR EQUIPMENT AS REQUIRED BY LATEST APPROVED VERISON OF THE NATIONAL ELECTRICAL CODE, PRIOR TO ORDER. <br />MANUFACTURER TO PROVIDE SCCR LISTING (5 KAIC MINIMUM OR PER ELECTRICAL CONTRACTOR CALCULATION) INSIDE CONTROL PANEL AS REQUIRED BY NATIONAL ELECTRICAL CODE. <br />2 PROVIDE FULL ECONOMIZER (ENTHALPY) CYCLE. WITH (POWERED / BAROMETRIC) RELIEF SYSTEM <br />3 ECONOMIZER SHALL BE CAPABLE OF PROVIDING PARTIAL COOLING IN ADDITION TO MECHANICAL COOLING AS REQUIRED TO MEET THE REMAINDER OF THE LOAD PER SECTION C403.3.1 <br />4 MINIMUM UNIT EFFICIENCY TO MEET THE ENERGY CODE TABLE C403 <br />5 PROVIDE WITH SUPPLEMENTAL ELECTRIC HEATER IN UNIT FOR OPERATION DURING DEFROST MODE <br />6 OUTSIDE AIR INDICATES MINIMUM CFM PER ASHRAE. TAB WORK MUST MEET OR EXCEED INDICATED QUANTITY. <br />7 PROVIDE SUPPLY VFD'S FOR VARIABLE VOLUME CAPACITY PER ENERGY CODE <br />8 PROVIDE WITH MERV 8 MINIMUM FILTRATION UPSTREAM OF COOLING COIL <br />9 PROVIDE WITH ROOF CURB <br />10 PROVIDE STAND-ALONE DIGITAL 7-DAY THERMOSTAT <br />11 PROVIDE WITH BACKUP ELECTRIC HEATER TO OPERATE DURING DEFROST OPERATION <br />12 PROVIDE VARIABLE SPEED FAN CONTROL FOR SUPPLY FANS > 5 TONS (<66% OF DESIGN SPEED AT LOW SPEED SETTING MAXIMUM) PER ENERGY CODE C403.2.11.5 <br />13 IF > 5 TONS & ECONOMIZER PROVIDED, UNIT TO INCLUDE TWO STAGE MIN COOLING (3 STAGE IF BETWEEN 5 & 20 TONS, 4 STAGE FOR > 20 TONS) AS DEFINED BY ENERGY CODE C403.5.1 <br />14 PROVIDE FILTERS AT RETURN AIR OPENINGS OF NEW AND/OR EXISTING UNITS, UPSTREAM OF ANY HEAT EXCHANGER OR COILS PER SMC / IMC 605 <br />15 PROVIDE SEISMIC BRACING PER ACSE 7, UNLESS: UNIT IS WALL MOUNTED OR <20 LBS OR IS RIGID MOUNTED INLINE WITH DUCT (NO FLEX) AND <75 LBS <br />16 HEAT PUMPS SHALL UTILIZE COMPRESSION HEATING AS FIRST STAGE OF HEAT AND AUXILIARY ELECTRIC HEAT SHALL NOT OPERATE ABOVE 40'F. <br />17 HEATING & COOLING FANS/PUMPS SHALL SHUT OFF WHEN THERE IS NO CALL FOR HEATING AND COOLING IN THE ZONE PER WSEC 2018 C403.3.5.2, EXCEPT IF HEATING/COOLING FANS <0.12W/CFM <br />1' 3' 5' 10' 15' 25 <br />SCALE: 81 `1' 11 <br />2' 4' <br />FOR CITY USE: <br />12/02/22 JMH ISSUE FOR PERMIT <br />No. Date By Description <br />Design Team <br />Design <br />JMH <br />Drawn <br />FVP <br />Checked <br />DTN <br />Pre -Construction Number <br />14-22-22759 <br />Construction Number <br />Issue Date <br />12/02/22 <br />PARTIAL ROOF <br />PLANS & SCHEDULE <br />- HVAC <br />1�� <br />