My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023/05/10 Council Agenda Packet
>
Council Agenda Packets
>
2023
>
2023/05/10 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2023 10:17:28 AM
Creation date
5/16/2023 8:59:38 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/10/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
888
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC <br />1+1 �I RESTROOM <br />COMPANY <br />Building Better Places To Go.SM <br />Price Proposal: EMB Public Restroom, City of Everett, WA <br />Date: April 10, 2023 <br />Reference: 11543A-4/2/2023-4 <br />Sourcewell: Contract # 081721-PRM <br />Our Offer to Sell: <br />1. Restroom Building and Shipping Cost @ $ 349,403 <br />Public Restroom Company (PRC) herein bids to furnish (building only per plans and <br />specifications, delivered to site with all costs except installation including applicable taxes <br />excluding retention. (Retention is not allowed as this is materials or a product fully assembled <br />before shipment to the site and therefore not subject to retention.) <br />2. Installation: Turnkey Installation Not Included. To be Contracted with PRC Separately. <br />Public Restroom Company also includes in this two-part quotation our turnkey installation <br />package for this building. Our national factory authorized installation team will: <br />a. Arrive onsite to confirm and verify the Owner/General Contractor provided scope of <br />work in preparation for installation including access to the site. <br />b. Verify the building pad size, building corners, finished slab elevation, utility depth and <br />location, meter size and distance from building, and compaction compliance. <br />c. Excavate the utility trenches for placement of our prefabricated underground piping <br />tree for the buildings plumbing and electrical, set the kit in place, provide the water <br />test for inspection before backfilling, and then place the site adjacent coarse sand you <br />provide to us alongside the building pad and screed it level for final building <br />placement. We will need onsite water availability for wetting the sand bed before <br />building placement to consolidate the pad. <br />d. Set the building on the site pad. <br />e. Connect the utility piping stub ups to the building piping stub down building points of <br />connection for water, sewer, and electrical conduit to the building internal electrical <br />panel. <br />3. Owner/General Contractor Final Tie In of Utilities and other site work: <br />a. The Owner/Contractor is responsible for making all final plumbing connections at the 6' <br />POC locations. <br />b. The Owner/Contractor is responsible for pulling wire and completing all final tie-ins to <br />the electrical panel from the 6' POC location. <br />c. The Owner/Contractor is responsible for preparing the pad/foundation. PRC will trench <br />through provided pad/foundation to run utilities to 6' POC locations. <br />4. Total Cost of the Building @ $ 349,403 (Minus Required PRC Turnkey Installation). <br />EMB Public Restroom - City of Everett, WA' 4/10/20231 Reference # 11543A-4/2/2023-4 <br />2587 Business Parkway I Minden, NV 89423 I www.PublicRestroomCompany.com I p: 888-888-2060 I f: 888-888-1448 <br />1 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.