My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6300 MERRILL CREEK PKY WATERTECTONICS 2023-06-16
>
Address Records
>
MERRILL CREEK PKY
>
6300
>
WATERTECTONICS
>
6300 MERRILL CREEK PKY WATERTECTONICS 2023-06-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2023 9:25:22 AM
Creation date
5/16/2023 1:12:24 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
6300
Tenant Name
WATERTECTONICS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />H <br />ECEOMC T A <br />rJ <br />ARCHITECTURE + PLANNING + DESIGN <br />September 8th, 2022 SEP 13 2022 <br />Mr. Drew Martin <br />CITY OF EVERETT <br />Permit Services <br />City of Everett Permit Services <br />3200 Cedar Street <br />Everett, WA 98201 <br />RE: Building Permit Review Comment Responses for the Watertectonics Project (B2208-008) <br />Dear Mr. Martin: <br />The purpose of this letter is to address the comments provided by the City of Everett in the Building Code <br />Review Comments letter (August 11, 2022) for the Watertectonics Project at 6300 Merrill Creek Parkway <br />Ste. C-100 (B2208-008). This review response is intended to accompany the revised Building Permit <br />drawings for this project (revision dated September 8, 2022). <br />Comments are presented below in italics, followed by applicant responses in standard text below each <br />comment. <br />Architectural <br />General: <br />The project involves an occupancy change to the enlarged lunchroom to an occupancy "A-2" <br />classification. Note that the existing lunchroom cannot be classified as A-2 as it does not appear to <br />have two exits. Construction drawings prepared by a professional architect licensed in the state of <br />Washington are required where there is a change to the life -safety of the building. The drawings <br />should be sealed and signed by the architect -of -record. See IBC Section 107.1 and RCW section <br />78.08.410 Item (7). <br />• Response: Noted. Title block has been updated to note permit set and include seal and <br />signature by the Architect -of -Record. Please see updated permit drawings dated <br />8/26/2022. <br />Egress: <br />2. Conference Room 2 has been converted to an occupancy "A-2" classification. The following <br />comments should be addressed. <br />a. Two exits are required. A full plan should be provided for this room. An egress plan showing <br />two separate exit paths out of the building should be included. See IBC Table 1006.2.1 <br />b. Provide a maximum occupant load sign per IBC Section 1004.9. The location of the sign <br />should be specified adjacent to the main exit from the room <br />c. The floor plan should specify exit signs. Intermediate exit signs should include direction <br />arrows where door signs are not readily visible. The lighting, including existing locations, <br />should specify a minimum 90-minute uninterrupted supply power per IBC Section 1013.6.3. <br />See IBC Section 10 13. 1 <br />6211 Roosevelt Way Northeast I Seattle, WA 98115 1206 522 3830 1 www.tca-inc.com ' L <br />
The URL can be used to link to this page
Your browser does not support the video tag.