HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 If the Contracting Agency uses a nuclear density gauge to determine density the test <br /> 2 procedures FOP for WAQTC TM 8 and WSDOT SOP T 729 will be used on the day the I <br /> 3 mix is placed and prior to opening to traffic. <br /> 4 <br /> 5 Roadway cores for density may be obtained by either the Contracting Agency or the I <br /> 6 Contractor in accordance with WSDOT SOP 734. The core diameter shall be 4-inches <br /> 7 minimum, unless otherwise approved by the Engineer. Roadway cores will be tested by <br /> 8 the Contracting Agency in accordance with WSDOT FOP for AASHTO T 166. I <br /> 9 <br /> 10 If the Contract includes the Bid item "Roadway Core" the cores shall be obtained by the I <br /> 11 Contractor in the presence of the Engineer on the same day the mix is placed and at <br /> 12 locations designated by the Engineer. If the Contract does not include the Bid item <br /> 13 "Roadway Core" the Contracting Agency will obtain the cores. <br /> 14 1 <br /> 15 For a lot in progress with a CPF less than 0.75, a new lot will begin at the Contractor's <br /> 16 request after the Engineer is satisfied that material conforming to the Specifications can I <br /> 17 be produced. <br /> 18 <br /> 19 HMA mixture accepted by commercial evaluation and HMA constructed under conditions I <br /> 20 other than those listed above shall be compacted on the basis of a test point evaluation <br /> 21 of the compaction train. The test point evaluation shall be performed in accordance with <br /> 22 instructions from the Engineer. The number of passes with an approved compaction <br /> 23 train, required to attain the maximum test point density, shall be used on all subsequent <br /> 24 paving. <br /> 25 I <br /> 26 HMA for preleveling shall be thoroughly compacted. HMA that is used for preleveling <br /> 27 wheel rutting shall be compacted with a pneumatic tire roller unless otherwise approved <br /> 28 by the Engineer. I <br /> 29 <br /> 30 Test Results <br /> 31 For a sublot that has been tested with a nuclear density gauge that did not meet the <br /> 32 minimum of 91 percent of the reference maximum density in a compaction lot with a CPF <br /> 33 below 1.00 and thus subject to a price reduction or rejection, the Contractor may request <br /> 34 that a core be used for determination of the relative density of the sublot. The relative I <br /> 35 density of the core will replace the relative density determined by the nuclear density <br /> 36 gauge for the sublot and will be used for calculation of the CPF and acceptance of HMA <br /> 37 compaction lot. I <br /> 38 <br /> 39 When cores are taken by the Contracting Agency at the request of the Contractor, they <br /> 40 shall be requested by noon of the next workday after the test results for the sublot have <br /> 41 been provided or made available to the Contractor. Core locations shall be outside of <br /> 42 wheel paths and as determined by the Engineer. Traffic control shall be provided by the <br /> 43 Contractor as requested by the Engineer. Failure by the Contractor to provide the I <br /> 44 requested traffic control will result in forfeiture of the request for cores. When the CPF for <br /> 45 the lot based on the results of the HMA cores is less than 1.00, the cost for the coring will <br /> 46 be deducted from any monies due or that may become due the Contractor under the I <br /> 47 Contract at the rate of$200 per core and the Contractor shall pay for the cost of the <br /> 48 traffic control. <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) I <br /> WO#3788 March 2,2023 SP-86 <br />