My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 sample will not be tested with the same tester that ran the original acceptance test. The <br /> I <br /> 2 sample will be tested for a complete gradation analysis, asphalt binder content, and, at <br /> 3 the option of the agency, Va. The results of the retest will be used for the acceptance of <br /> 4 the HMA in place of the original sublot sample test results. The cost of testing will be <br /> I <br /> 5 6 deducted from any monies due or that may come due the Contractor under the Contract <br /> at the rate of$500 per sample. <br /> 7 <br /> I8 5-04.3(9)D Mixture Acceptance — Commercial Evaluation <br /> 9 If sampled and tested, HMA produced under Commercial Evaluation and having all <br /> 10 constituents falling within the tolerance limits of the job mix formula shall be accepted at <br /> 11 the unit Contract price with no further evaluation. When one or more constituents fall <br /> 12 outside the commercial tolerance limits in the Job Mix Formula shown in 5-04.3(9), the <br /> 13 lot shall be evaluated in accordance with Section 1-06.2 to determine the appropriate <br /> I 14 CPF. The commercial tolerance limits will be used in the calculation of the CPF and the <br /> 15 maximum CPF shall be 1.00. When less than three sublots exist, backup samples of the <br /> 16 existing sublots or samples from the street shall be tested to provide a minimum of three <br /> I 17 sets of results for evaluation. <br /> 18 <br /> 19 For each lot of HMA mix produced and tested under Commercial Evaluation when the <br /> I <br /> 20 calculated CPF is less than 1.00, a Nonconforming Mix Factor (NCMF) will be <br /> 21 determined. The NCMF equals the algebraic difference of CPF minus 1.00 multiplied by <br /> 22 60 percent. The Job Mix Compliance Price Adjustment will be calculated as the product <br /> I <br /> 23 of the NCMF, the quantity of HMA in the lot in tons, and the unit Contract price per ton of <br /> 24 mix. <br /> 25 <br /> I 26 If a constituent is not measured in accordance with these Specifications, its individual <br /> 27 pay factor will be considered 1.00 in calculating the Composite Pay Factor(CPF). <br /> 28 <br /> I <br /> 29 5-04.3(10) HMA Compaction Acceptance <br /> 30 HMA mixture accepted by nonstatistical evaluation that is used in traffic lanes, including <br /> 31 lanes for intersections, ramps, truck climbing, weaving, and speed change, and having a <br /> I 32 specified compacted course thickness greater than 0.10-foot, shall be compacted to a <br /> 33 specified level of relative density. The specified level of relative density shall be a <br /> 34 Composite Pay Factor (CPF) of not less than 0.75 when evaluated in accordance with <br /> I <br /> 35 Section 1-06.2, using a LSL of 91.0 (minimum of 91 percent of the maximum density). <br /> 36 The maximum density shall be determined by WSDOT FOP for AASHTO T 729. The <br /> 37 specified level of density attained will be determined by the evaluation of the density of <br /> I <br /> 38 39 the pavement. The density of the pavement shall be determined in accordance with <br /> WSDOT FOP for WAQTC TM 8, except that gauge correlation will be at the discretion of <br /> 40 the Engineer, when using the nuclear density gauge and WSDOT SOP 736 when using <br /> I 41 cores to determine density. <br /> 42 <br /> 43 Tests for the determination of the pavement density will be taken in accordance with the <br /> I 44 required procedures for measurement by a nuclear density gauge or roadway cores after <br /> 45 completion of the finish rolling. <br /> 46 <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> I <br /> WO#3788 March 2,2023 SP-85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.