My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 HMA mixture accepted by commercial evaluation and HMA constructed under conditions <br /> 2 other than those listed above shall be compacted on the basis of a test point evaluation ' <br /> 3 of the compaction train. The test point evaluation shall be performed in accordance with <br /> 4 instructions from the Engineer. The number of passes with an approved compaction <br /> 5 train, required to attain the maximum test point density, shall be used on all subsequent <br /> 6 paving. <br /> 7 <br /> 8 HMA for preleveling shall be thoroughly compacted. HMA that is used to prelevel wheel , <br /> 9 ruts shall be compacted with a pneumatic tire roller unless otherwise approved by the <br /> 10 Engineer. <br /> 11 I <br /> 12 5-04.3(10)D2 HMA Compaction Nonstatistical Evaluation —Acceptance Testing <br /> 13 The location of the HMA compaction acceptance tests will be randomly selected by the I <br /> 14 Engineer from within each sublot, with one test per sublot. <br /> 15 <br /> 16 5-04.3(10)D3 HMA Nonstatistical Compaction — Price Adjustments I 17 For each compaction lot with one or two sublots, having all sublots attain a relative <br /> 18 density that is 91 percent of the reference maximum density the HMA shall be accepted <br /> 19 at the unit Contract price with no further evaluation. When a sublot does not attain a I <br /> 20 relative density that is 91 percent of the reference maximum density, the lot shall be <br /> 21 evaluated in accordance with Section 1-06.2 to determine the appropriate CPF. The <br /> 22 maximum CPF shall be 1.00, however, lots with a calculated CPF in excess of 1.00 will I <br /> 23 be used to offset lots with CPF values below 1.00 but greater than 0.90. Lots with CPF <br /> 24 lower than 0.90 will be evaluated for compliance per 5-04.3(11). Additional testing by <br /> 25 either a nuclear moisture-density gauge or cores will be completed as required to provide I <br /> 26 a minimum of three tests for evaluation. <br /> 27 <br /> 28 For compaction below the required 91% a Non-Conforming Compaction Factor (NCCF) I <br /> 29 will be determined. The NCCF equals the algebraic difference of CPF minus 1.00 <br /> 30 multiplied by 40 percent. The Compaction Price Adjustment will be calculated as the <br /> 31 product of CPF, the quantity of HMA in the compaction control lot in tons, and the unit <br /> 32 Contract price per ton of mix. <br /> 33 <br /> 34 5-04.3(11) Reject Work I <br /> 35 <br /> 36 5-O4.3(11)A Reject Work General <br /> 37 Work that is defective or does not conform to Contract requirements shall be rejected. I <br /> 38 The Contractor may propose, in writing, alternatives to removal and replacement of <br /> 39 rejected material. Acceptability of such alternative proposals will be determined at the <br /> 40 sole discretion of the Engineer. HMA that has been rejected is subject to the I <br /> 41 requirements in Section 1-06.2(2) and this specification, and the Contractor shall submit <br /> 42 a corrective action proposal to the Engineer for approval. <br /> 43 I <br /> 44 5-O4.3(11)B Rejection by Contractor <br /> 45 The Contractor may, prior to sampling, elect to remove any defective material and <br /> 46 replace it with new material. Any such new material will be sampled, tested, and 1 <br /> 47 evaluated for acceptance. <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) I <br /> WO#3788 March 2,2023 SP-88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.