HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I2 5-O4.3(11)C Rejection Without Testing (Mixture or Compaction) <br /> 3 The Engineer may, without sampling, reject any batch, load, or section of Roadway that <br /> 4 appears defective. Material rejected before placement shall not be incorporated into the <br /> I 5 pavement. Any rejected section of Roadway shall be removed. <br /> 6 <br /> I <br /> 7 8 No payment will be made for the rejected materials or the removal of the materials <br /> unless the Contractor requests that the rejected material be tested. If the Contractor <br /> 9 elects to have the rejected material tested, a minimum of three representative samples <br /> 10 will be obtained and tested. Acceptance of rejected material will be based on <br /> 11 conformance with the nonstatistical acceptance Specification. If the CPF for the rejected <br /> 12 material is less than 0.75, no payment will be made for the rejected material; in addition, <br /> 13 the cost of sampling and testing shall be borne by the Contractor. If the CPF is greater <br /> I <br /> 14 than or equal to 0.75, the cost of sampling and testing will be borne by the Contracting <br /> 15 Agency. If the material is rejected before placement and the CPF is greater than or equal <br /> 16 to 0.75, compensation for the rejected material will be at a CPF of 0.75. If rejection <br /> 17 occurs after placement and the CPF is greater than or equal to 0.75, compensation for <br /> 18 the rejected material will be at the calculated CPF with an addition of 25 percent of the <br /> 19 unit Contract price added for the cost of removal and disposal. <br /> I20 <br /> 21 5-O4.3(11)D Rejection -A Partial Sublot <br /> I <br /> 22 In addition to the random acceptance sampling and testing, the Engineer may also <br /> 23 isolate from a normal sublot any material that is suspected of being defective in relative <br /> 24 density, gradation or asphalt binder content. Such isolated material will not include an <br /> 25 original sample location. A minimum of three random samples of the suspect material will <br /> I <br /> 26 be obtained and tested. The material will then be statistically evaluated as an <br /> 27 independent lot in accordance with Section 1-06.2(2). <br /> 28 <br /> 29 5-O4.3(11)E Rejection -An Entire Sublot <br /> 30 An entire sublot that is suspected of being defective may be rejected. When a sublot is <br /> P31 rejected a minimum of two additional random samples from this sublot will be obtained. <br /> 32 These additional samples and the original sublot will be evaluated as an independent lot <br /> 33 in accordance with Section 1-06.2(2). <br /> 34 <br /> 35 5-O4.3(11)F Rejection -A Lot in Progress <br /> 36 The Contractor shall shut down operations and shall not resume HMA placement until <br /> I <br /> 37 such time as the Engineer is satisfied that material conforming to the Specifications can <br /> 38 be produced: <br /> 39 <br /> 40 1. When the Composite Pay Factor (CPF) of a lot in progress drops below 1.00 and <br /> 41 the Contractor is taking no corrective action, or <br /> 42 2. When the Pay Factor (PF) for any constituent of a lot in progress drops below <br /> P43 0.95 and the Contractor is taking no corrective action, or <br /> 44 3. When either the PFi for any constituent or the CPF of a lot in progress is less <br /> 45 than 0.75. <br /> I46 <br /> 47 5-O4.3(11)G Rejection -An Entire Lot (Mixture or Compaction) <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> I <br /> WO#3788 March 2,2023 SP-89 <br />