My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 HMA approaches shall be constructed at the locations shown in the Plans or where <br /> 2 staked by the Engineer. The Work shall be performed in accordance with Section 5-04. I <br /> 3 <br /> 4 5-04.4 Measurement I <br /> 5 "Planing Bituminous Pavement (2" Deep)", shall be measured by the square yard. <br /> 6 <br /> 7 "HMA Class '/2", PG 64-22", shall be measured by the ton. I <br /> 8 <br /> 9 5-04.5 Payment <br /> 10 Payment will be made in accordance with Section 1-04.1, for each of the following bid I <br /> 11 items that are included in the proposal: <br /> 12 <br /> 13 "HMA Class '/2" PG 64-22", per ton. I <br /> 14 <br /> 15 The unit contract price per ton for "HMA Class '/2" PG 64-22", shall be full compensation <br /> 16 for all costs incurred to carry out the requirements of Section 5-04 except for those costs 1 <br /> 17 included in other items which are included in the sub-section and which are included in <br /> 18 the proposal. <br /> 19 <br /> 20 HMA for Pre-leveling, if required by the Engineer, will be paid for under bid item, "HMA I <br /> 21 Class '/2" PG 64-22", per ton. <br /> 22 <br /> 23 All costs for "Asphalt Tack Coat", "Anti Stripping Additive", "Joint Sealant", and I <br /> 24 "Compaction Adjustment" shall be included in the unit contract price per ton for "HMA <br /> 25 Class '/2" PG 64-22", per ton. <br /> 26 I <br /> 27 "Planing Bituminous Pavement (2" Deep)", per square yard. <br /> 28 <br /> 29 The Unit contract price for"Planing Bituminus Pavement (2" Deep), per square yard shall I <br /> 30 be full payment for all costs incurred to perform the work described in Section 5-04.3(14). <br /> 31 <br /> 32 <br /> 33 5-04.5.OPT2.GR5 <br /> 34 (January 13, 2021) <br /> 35 Asphalt Cost Price Adjustment I <br /> 36 The Contracting Agency will make an Asphalt Cost Price Adjustment, either a credit or a <br /> 37 payment, for qualifying changes in the reference cost of asphalt binder. The adjustment <br /> 38 will be applied to partial payments made according to Section 1-09.9 for the following bid I <br /> 39 items when they are included in the proposal: <br /> 40 <br /> 41 "HMA Cl. PG " <br /> 42 "HMA for Approach Cl. PG I <br /> 43 "HMA for Preleveling Cl. PG " <br /> 44 "HMA for Pavement Repair Cl. PG " <br /> 45 "Commercial HMA" I <br /> 46 <br /> 47 The adjustment is not a guarantee of full compensation for changes in the cost of asphalt <br /> 48 binder. The Contracting Agency does not guarantee that asphalt binder will be available 1 <br /> 49 at the reference cost. <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 SP-94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.