My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 For mainline planing operations, the equipment shall have automatic controls, with <br /> I <br /> 2 sensors for either or both sides of the equipment. The controls shall be capable of <br /> 3 sensing the proper grade from an outside reference line, or a mat-referencing device. <br /> 4 The automatic controls shall also be capable of maintaining the desired transverse slope. <br /> I <br /> 5 The transverse slope controller shall be capable of maintaining the mandrel at the <br /> 6 desired slope (expressed as a percentage) within plus or minus 0.1 percent. <br /> 7 <br /> I 8 Pre-level course is not anticipated on any of the selected streets. If, however, after <br /> 9 plaining operations, drivability issues cannot be resolved with 2" overlay, pre-level will be <br /> 10 required as directed and paid for by"HMA Class 1/2" PG 64-22", per ton. Contractor is <br /> Ii 1 strongly encouraged to bid the work to cover their cost of pre-level operations. <br /> 12 <br /> 13 5-04.3(14)A Paving and Planing Under Traffic <br /> I14 <br /> 15 5-04.3(14)A1 General <br /> 16 In addition the requirements of Section 1-07.23 and the traffic controls required in <br /> I17 Section 1-10, and unless the Contract specifies otherwise or the Engineer approves, the <br /> 18 Contractor must comply with the following: <br /> 19 I 20 1. Intersections: <br /> 21 a. Keep intersections open to traffic at all times, except when paving or planing <br /> I 22 operations through an intersection requires closure. Such closure must be kept <br /> 23 to the minimum time required to place and compact the HMA mixture, or plane <br /> 24 as appropriate. For paving, schedule such closure to individual lanes or portions <br /> I <br /> 25 thereof that allows the traffic volumes and schedule of traffic volumes required in <br /> 26 the approved traffic control plan. Schedule work so that adjacent intersections <br /> 27 are not impacted at the same time and comply with the traffic control restrictions <br /> 28 required by the Contracting Agency. Each individual intersection closure or <br /> I29 partial closure, must be addressed in the traffic control plan, which must be <br /> 30 submitted to and accepted by the Engineer, see Section 1-10.2(2). <br /> 31 b. When planing or paving and related construction must occur in an <br /> I32 intersection, schedule and sequence such work into quarters of the intersection, <br /> 33 or half or more of an intersection with side street detours unless otherwise <br /> 34 directed by the Engineer. Be prepared to sequence the work to individual lanes <br /> 35 or portions thereof. <br /> I 36 c. Allow new compacted HMA asphalt to cool to ambient temperature before <br /> 37 any traffic is allowed on it. Traffic is not allowed on newly placed asphalt until <br /> I38 'approval has been obtained from the Engineer. <br /> 39 2. Temporary centerline marking, post-paving temporary marking, temporary stop <br /> 40 bars, and maintaining temporary pavement marking must comply with Section 8- <br /> I 41 23. <br /> 42 3. Permanent pavement marking must comply with Section 8-22. <br /> 43 I 44 <br /> 45 5-04.3(15) Vacant <br /> I 46 <br /> 47 5-04.3(16) HMA Road Approaches <br /> U <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> IWO#3788 March 2,2023 SP-93 <br />
The URL can be used to link to this page
Your browser does not support the video tag.