My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 then be carefully painted with hot asphalt cement or asphalt emulsion and shall be <br /> 2 immediately covered with dry paving sand before the asphalt cement solidifies. <br /> 3 <br /> 4 The inside throat of the structure shall be thoroughly mortared and plastered through <br /> I 5 to the outside of the structure's concrete adjustment rings. <br /> 6 <br /> 7 Castings that need replacement shall be identified by the City of Everett. <br /> I <br /> 8 9 Replacement casting will be supplied by the City of Everett and original casting will <br /> be picked up by the City of Everett. <br /> 10 <br /> I 11 <br /> 12 GLF 7-05.3(5).DOCX <br /> 13 Adjusting Valve Boxes to Grade <br /> I14 (******) <br /> 15 <br /> I <br /> 16 Section 7-05.3 of the standard specifications is supplemented with the following: <br /> 17 <br /> 18 (******) <br /> I19 Adjustment of valve boxes to grade shall occur only as needed and/or directed by <br /> 20 the engineer. Existing valve boxes and covers shall be adjusted to the grade as <br /> 21 staked or otherwise designated by the Engineer. The adjustment of the valve box to <br /> I 22 grade by the use of riser rings is not allowed. <br /> 23 <br /> 24 Removal operations shall be conducted to prevent damage to the valve boxes. Any <br /> I 25 parts or materials damaged due to the Contractor's operations shall be replaced at <br /> 26 the Contractor's expense. Castings that need replacement shall be identified by the <br /> 27 City of Everett. <br /> I 28 <br /> 29 The Contractor shall conduct the valve box adjustments so that the fully-adjusted box <br /> 30 allows the respective valve to be fully operational. The Contractor shall remove all <br /> I 31 debris from the adjusted valve boxes to ensure such operational condition. <br /> 32 <br /> 33 <br /> 34 GLF 7-05.4.DOCX <br /> I35 7-05.4 Measurement <br /> 36 <br /> 37 Section 7-05.4 of the standard specifications is deleted and replaced with the following: <br /> 38 <br /> 39 (******) <br /> I <br /> 40 "Adjust Manhole to Grade", shall be measured per each. <br /> 41 <br /> 42 "Adjust Catch Basin/Inlet to Grade", shall be measured per each. <br /> I 43 <br /> 44 "Adjust Valve Box to Grade", shall be measured per each. <br /> 45 <br /> I46 <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> IWO#3788 March 2,2023 SP-97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.