My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 GLF 7-05.5.DOCX <br /> 2 7-05.5 Payment <br /> 3 <br /> 4 Section 7-05.5 of the standard specifications is deleted and replaced with the following: <br /> 5 <br /> 6 (******) <br /> 7 Payment will be made for each of the following bid items that are included in the proposal: 1 <br /> 8 <br /> 9 "Adjust Manhole to Grade", per each. <br /> 10 '11 "Adjust Catch Basin/Inlet to Grade", per each. <br /> 12 <br /> 13 "Adjust Valve Box to Grade", per each. <br /> 14 <br /> 15 The payment for"Adjust Manhole to Grade", "Adjust Catch Basin/Inlet to Grade", shall be <br /> 16 full compensation for all costs necessary to make the adjustment including temporary I <br /> 17 cover to adjust the existing structure to required elevation, construction of the asphalt <br /> 18 transition around the structure, and restoration of the adjacent area. Adjustment of any <br /> 19 structures twice will be paid as one adjustment. <br /> 20 <br /> 21 END DIVISION7.RTF <br /> 22 <br /> 23 END DIVISION 7 <br /> 24 <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> 1 <br /> 1 <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 SP-98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.