My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 8-09.4 Measurement <br /> 2 <br /> 3 Section 8-09.4 is supplemented with the following: <br /> 4 <br /> 5 Measurement of markers will be per hundred for markers furnished and in place. <br /> 6 <br /> 7 8-09.5 Payment <br /> 8 <br /> 9 Section 8-09.5 is supplemented with the following: <br /> 10 <br /> 11 Payment will be made in accordance with section 1-04.1, for the following Bid item 1 <br /> 12 included in the Proposal: <br /> 13 <br /> 14 "Raised Pavement Marker Type 2", per hundred. <br /> 15 <br /> 16 <br /> 17 GLF 8-13.DOCX <br /> 18 8-13 MONUMENT CASES <br /> 19 <br /> 20 Section 8-13 of the standard specifications is deleted and replaced by the following: <br /> 21 <br /> 22 (******) <br /> 23 8-13.1 Description <br /> 24 <br /> 25 This work will consist of adjusting existing survey monument cases to grade in <br /> 26 accordance with Standard Drawing No. 323 and these Special Provisions. <br /> 27 <br /> 28 8-13.2 Vacant <br /> 29 <br /> 30 8-13.3 Construction Requirements <br /> 31 <br /> 32 Existing monument castings shall be adjusted to grade in the same manner as for <br /> 33 manholes in Section 7-05.3(1) of these Special Provisions. <br /> 34 <br /> 35 8-13.4 Measurement <br /> 36 <br /> 37 Measurement of monument case and cover will be by the unit for each monument case <br /> 38 and cover adjusted to grade. <br /> 39 <br /> 40 8-13.5 Payment <br /> 41 <br /> 42 Payment will be made for the following bid items when included in the proposal: <br /> 43 <br /> 44 "Adjust Existing Monument Castings to Grade," per each; I <br /> 45 <br /> 46 The unit contract price for "Adjust Existing Monument Casing to Grade" shall include all <br /> 47 costs to adjust the casting to finished grade. <br /> 48 <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 SP-100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.