My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 *** <br /> 2 38' St & Broadway Northbound and Southbound I <br /> 3 37th St & Broadway Northbound and Southbound <br /> 4 33' St & Broadway Northbound and Southbound <br /> 5 Pacific Ave & Broadway Northbound and Southbound I <br /> 6 Wall St & Broadway Northbound and Southbound <br /> 7 <br /> 8 *** <br /> 9 <br /> 10 The permanent thermal detection system shall be installed on the signal mast <br /> 11 arm on a 6' long camera mount bracket at a location directed by the Engineer, I <br /> 12 as close as practical to the end of the mast arm. The video detection cable shall <br /> 13 be installed in the mast arm per manufacturers recommendations. Any coiled <br /> 14 slack cable shall be mounted to the camera mount bracket at the back of the <br /> 15 pole. In the signal control cabinet, a video detection module shall be installed, <br /> 16 along with a surge protector and 4x6 fuse kit assembly. Video detection cable <br /> 17 hall be connectorized and all cables terminated to complete the system. City of <br /> 18 Everett signal technician will direct location of cable terminations, VIP module, I <br /> 19 and other hardware. Through the Engineer, the contractor shall contact Steve <br /> 20 Sawyer (425)328-0643 a minimum 3 days prior to activation to coordinate a <br /> 21 signal technician to be on site. I <br /> 22 <br /> 23 <br /> 24 8-20.3.GR8 <br /> 25 Construction Requirements <br /> 26 <br /> 27 8-20.3(14).GR8 <br /> 28 Signal Systems <br /> 29 <br /> 30 8-20.3(14),INSTI.GR8 <br /> 31 Section 8-20.3(14) is supplemented with the following: <br /> 32 <br /> 33 CNH 8-20.3(14)C INDUCTION LOOPS.DOCX <br /> 34 8-20.3(14)C Induction Loop Vehicle Detectors <br /> 35 <br /> 36 Section 8-20.3(14)C is supplemented with the following: <br /> 37 <br /> 38 (******) <br /> 39 Induction loops shall be constructed as detailed in City of Everett Drawing Nos. I <br /> 40 804, 805, 809, 810, and Section 8-20.3(14)C of the Standard Specifications with <br /> 41 the following modifications: <br /> 42 <br /> 43 1. The loop locations shall be marked on the pavement by the contractor <br /> 44 and approved by the engineer prior to sawcutting. At no point shall any <br /> 45 of the sawcuts pass closer than 2' to any utility cover. <br /> 46 2. Loop detector sealant shall be as shown in City of Everett Standard <br /> 47 Drawing 809, or as approved by the Engineer. <br /> 48 3. Rope is not required. <br /> 1 <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 SP-104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.