My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 8-23.5 Payment <br /> ' 2 <br /> 3 Section 8-23.5 is supplemented read as follows: <br /> 4 <br /> 5 (******) <br /> 6 Temporary Pavement Marking will be paid for under bid item "Temporary Pavement <br /> 7 Markings" per linear foot. This shall be full pay for constructing, maintaining, and <br /> ' 8 9 removing temporary lines and markers as specified. No additional compensation will be <br /> allowed when Contractor is required to repair temporary markings that have been <br /> 10 damaged or worn. <br /> ' 11 <br /> 12 GKK 8-26.DOCX <br /> 13 8-26 RESOLVE ABOVE GROUND CONFLICTS <br /> 14 (******) <br /> 15 <br /> 16 Section 8-26 is vacant and is replaced with the following: <br /> 1 17 <br /> 18 8-26.1 Description <br /> 1 19 <br /> 20 This work consists of resolving unanticipated above ground conflicts to conform to the <br /> 21 Project requirements due to construction, where they are not addressed by the <br /> 22 Construction Plans and Details. This bid item may be used to construct or modify items <br /> 23 which are not identified, nor addressed in the Plans and Details. <br /> 24 <br /> 25 8-26.2 Vacant <br /> I 26 <br /> 27 8-26.3 Construction Requirements <br /> 28 <br /> 29 As directed by Engineer, address and resolve underground conflicts that need <br /> 30 modification to accommodate construction. <br /> 31 <br /> 32 8-26.4 Vacant <br /> 33 <br /> 34 8-26.5 Payment <br /> 35 <br /> 111 <br /> 36 37 "Resolved unanticipated conflicts" Force Account, as provided in Section 1-09.6. <br /> 38 To provide a common Proposal for all Bidders, the Contracting Agency has entered an <br /> 39 amount in the Proposal to become a part of the Contractor's total Bid. <br /> 40 <br /> 41 <br /> 42 END DIVISION8.RTF <br /> 43 <br /> 44 END DIVISION 8 <br /> I <br /> 1 <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 SP-111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.