Laserfiche WebLink
I <br /> 1 8-23.5 Payment <br /> ' 2 <br /> 3 Section 8-23.5 is supplemented read as follows: <br /> 4 <br /> 5 (******) <br /> 6 Temporary Pavement Marking will be paid for under bid item "Temporary Pavement <br /> 7 Markings" per linear foot. This shall be full pay for constructing, maintaining, and <br /> ' 8 9 removing temporary lines and markers as specified. No additional compensation will be <br /> allowed when Contractor is required to repair temporary markings that have been <br /> 10 damaged or worn. <br /> ' 11 <br /> 12 GKK 8-26.DOCX <br /> 13 8-26 RESOLVE ABOVE GROUND CONFLICTS <br /> 14 (******) <br /> 15 <br /> 16 Section 8-26 is vacant and is replaced with the following: <br /> 1 17 <br /> 18 8-26.1 Description <br /> 1 19 <br /> 20 This work consists of resolving unanticipated above ground conflicts to conform to the <br /> 21 Project requirements due to construction, where they are not addressed by the <br /> 22 Construction Plans and Details. This bid item may be used to construct or modify items <br /> 23 which are not identified, nor addressed in the Plans and Details. <br /> 24 <br /> 25 8-26.2 Vacant <br /> I 26 <br /> 27 8-26.3 Construction Requirements <br /> 28 <br /> 29 As directed by Engineer, address and resolve underground conflicts that need <br /> 30 modification to accommodate construction. <br /> 31 <br /> 32 8-26.4 Vacant <br /> 33 <br /> 34 8-26.5 Payment <br /> 35 <br /> 111 <br /> 36 37 "Resolved unanticipated conflicts" Force Account, as provided in Section 1-09.6. <br /> 38 To provide a common Proposal for all Bidders, the Contracting Agency has entered an <br /> 39 amount in the Proposal to become a part of the Contractor's total Bid. <br /> 40 <br /> 41 <br /> 42 END DIVISION8.RTF <br /> 43 <br /> 44 END DIVISION 8 <br /> I <br /> 1 <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 SP-111 <br />