My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 1 COE INTRO.RTF <br /> ' 2 INTRODUCTION TO THE SPECIAL PROVISIONS <br /> 3 <br /> 4 <br /> 5 (December 10, 2020 APWA GSP) <br /> 6 <br /> 7 The work on this project shall be accomplished in accordance with the Standard Specifications <br /> ' 8 for Road, Bridge and Municipal Construction, 2023 edition, as issued by the Washington State <br /> 9 Department of Transportation (WSDOT) and the American Public Works Association (APWA), <br /> 10 Washington State Chapter (hereafter "Standard Specifications"). The Standard <br /> 11 Specifications, as modified or supplemented by these Special Provisions, all of which are <br /> 12 made a part of the Contract Documents, shall govern all of the Work. <br /> 13 <br /> ' 14 These Special Provisions are made up of both General Special Provisions (GSPs) from <br /> 15 various sources, which may have project-specific fill-ins; and project-specific Special <br /> 16 Provisions. Each Provision either supplements, modifies, or replaces the comparable <br /> 17 Standard Specification, or is a new Provision. The deletion, amendment, alteration, or addition <br /> ' 18 to any subsection or portion of the Standard Specifications is meant to pertain only to that <br /> 19 particular portion of the section, and in no way should it be interpreted that the balance of the <br /> 20 section does not apply. <br /> 21 <br /> 22 The project-specific Special Provisions are not labeled as such. The GSPs are labeled under <br /> 23 the headers of each GSP, with the effective date of the GSP and its source. For example: <br /> I 24 <br /> 25 (March 8, 2013 APWA GSP) <br /> 26 (April 1, 2013 WSDOT GSP) <br /> 27 (May 1, 2013 City of Everett GSP) <br /> 28 <br /> 29 Also incorporated into the Contract Documents by reference are: <br /> 1 30 • <br /> 31 • Manual on Uniform Traffic Control Devices for Streets and Highways, currently adopted <br /> edition, with Washington State modifications, if any <br /> 32 • Standard Plans for Road, Bridge and Municipal Construction, WSDOT/APWA, current <br /> ' 33 edition <br /> •34 • Design and Construction Standards & Specifications for Development, City of Everett, <br /> 35 current edition <br /> ' 36 <br /> 37 Contractor shall obtain copies of these publications, at Contractor's own expense. <br /> 38 <br /> ' 39 DIVISIONI.GR1 <br /> 40 Division 1 <br /> 41 General Requirements <br /> 42 <br /> 43 IB 51i1OR,AiGR it <br /> 44 DESCRIPTION OF WORK <br /> 45 <br /> 46 FDESWORK1.DOCX <br /> 47 (March 13, 1995) <br /> 48 This Contract provides for the improvement of***The construction of up to 5,120 tons of Hot <br /> 49 Mix Asphalt, Class '/2-inch, PG 64-22, two inches (2") thick, on principal arterial of Broadway <br /> 50 Avenue, including grinding, utility adjustments, such as manhole, catch basin, inlet, valve box, <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 SP-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.