Laserfiche WebLink
I <br /> 1 monument case and cover, striping, channelization, traffic induction loops and traffic <br /> 2 cameras***and other work, all in accordance with the attached Contract Plans, these Contract <br /> 3 Provisions, and the Standard Specifications. <br /> 4 <br /> 5 1-01.3.RTF , <br /> 6 1-01.3 Definitions <br /> 7 (January 19, 2022 APWA GSP) <br /> 8 <br /> 9 Delete the heading Completion Dates and the three paragraphs that follow it, and replace <br /> 10 them with the following: <br /> 11 <br /> 12 Dates <br /> 13 Bid Opening Date <br /> 14 The date on which the Contracting Agency publicly opens and reads the Bids. <br /> 15 Award Date <br /> 16 The date of the formal decision of the Contracting Agency to accept the lowest <br /> 17 responsible and responsive Bidder for the Work. , <br /> 18 Contract Execution Date <br /> 19 The date the Contracting Agency officially binds the Agency to the Contract. <br /> 20 Notice to Proceed Date <br /> 21 The date stated in the Notice to Proceed on which the Contract time begins. <br /> 22 Substantial Completion Date <br /> 23 The day the Engineer determines the Contracting Agency has full and unrestricted <br /> 24 use and benefit of the facilities, both from the operational and safety standpoint, any <br /> 25 remaining traffic disruptions will be rare and brief, and only minor incidental work, <br /> 26 replacement of temporary substitute facilities, plant establishment periods, or <br /> 27 correction or repair remains for the Physical Completion of the total Contract. <br /> 28 Physical Completion Date <br /> 29 The day all of the Work is physically completed on the project. All documentation <br /> 30 required by the Contract and required by law does not necessarily need to be <br /> 31 furnished by the Contractor by this date. <br /> 32 Completion Date <br /> 33 The day all the Work specified in the Contract is completed and all the obligations of <br /> 34 the Contractor under the contract are fulfilled by the Contractor. All documentation <br /> 35 required by the Contract and required by law must be furnished by the Contractor <br /> 36 before establishment of this date. <br /> 37 Final Acceptance Date <br /> 38 The date on which the Contracting Agency accepts the Work as complete. <br /> 39 <br /> 40 Supplement this Section with the following: <br /> 41 <br /> 42 All references in the Standard Specifications or WSDOT General Special Provisions, to <br /> 43 the terms "Department of Transportation", "Washington State Transportation <br /> 44 Commission", "Commission", "Secretary of Transportation", "Secretary", "Headquarters", <br /> 45 and "State Treasurer" shall be revised to read "Contracting Agency". <br /> 46 <br /> 47 All references to the terms "State" or"state" shall be revised to read "Contracting <br /> 48 Agency" unless the reference is to an administrative agency of the State of Washington, <br /> 49 a State statute or regulation, or the context reasonably indicates otherwise. <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 SP-2 <br />