My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Washington State Department of Labor and Industries <br /> Policy Statements <br /> (Regarding Production and Delivery of Gravel, Concrete, Asphalt, etc.) 1 <br /> WAC 296-127-018 Agency filings affecting this section <br /> Coverage and exemptions of workers involved in the production and delivery of <br /> gravel, concrete, asphalt, or similar materials. I <br /> (1) The materials covered under this section include but are not limited to: Sand, gravel, <br /> crushed rock, concrete, asphalt, or other similar materials. <br /> (2) All workers, regardless of by whom employed, are subject to the provisions of <br /> chapter 39.12 RCW when they perform any or all of the following functions: <br /> (a)They deliver or discharge any of the above-listed materials to a public works project <br /> site: <br /> (i) At one or more point(s) directly upon the location where the material will be <br /> incorporated into the project; or <br /> (ii) At multiple points at the project; or <br /> (iii) Adjacent to the location and coordinated with the incorporation of those materials. <br /> (b) They wait at or near a public works project site to perform any tasks subject to this <br /> section of the rule. <br /> (c) They remove any materials from a public works construction site pursuant to <br /> contract requirements or specifications (e.g., excavated materials, materials from <br /> demolished structures, clean-up materials, etc.). <br /> (d)They work in a materials production facility(e.g., batch plant, borrow pit, rock quarry, <br /> etc.,) which is established for a public works project for the specific, but not necessarily I <br /> exclusive, purpose of supplying materials for the project. <br /> (e) They deliver concrete to a public works site regardless of the method of 111 <br /> incorporation. <br /> (f) They assist or participate in the incorporation of any materials into the public works <br /> project. <br /> I <br /> I <br /> I <br /> Supplemental to Wage Rates 10 <br /> 03/03/2023 Edition, Published February 6, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.