Laserfiche WebLink
I <br /> 1 <br /> 2 All references to "State Materials Laboratory" shall be revised to read "Contracting <br /> 3 Agency designated location". <br /> 4 <br /> I <br /> 5 All references to "final contract voucher certification" shall be interpreted to mean the <br /> 6 Contracting Agency form(s) by which final payment is authorized, and final completion <br /> 7 and acceptance granted. <br /> I 8 <br /> 9 Additive <br /> 10 A supplemental unit of work or group of bid items, identified separately in the Bid <br /> II 1 12 Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition <br /> to the base bid. <br /> 13 <br /> 14 Alternate <br /> I15 One of two or more units of work or groups of bid items, identified separately in the Bid <br /> 16 Proposal, from which the Contracting Agency may make a choice between different <br /> methods or material of construction for performing the same work. <br /> I17 <br /> 18 <br /> 19 Business Day <br /> 20 A business day is any day from Monday through Friday except holidays as listed in <br /> U <br /> 21 Section 1-08.5. <br /> 22 <br /> 23 Contract Bond <br /> I <br /> 24 25 The definition in the Standard Specifications for"Contract Bond" applies to whatever <br /> bond form(s) are required by the Contract Documents, which may be a combination of a <br /> 26 Payment Bond and a Performance Bond. <br /> I 27 <br /> 28 Contract Documents <br /> 29 See definition for "Contract". <br /> 30 <br /> I <br /> 31 Contract Time <br /> 32 The period of time established by the terms and conditions of the Contract within which <br /> 33 the Work must be physically completed. <br /> I <br /> 34 <br /> 35 Notice of Award <br /> 36 The written notice from the Contracting Agency to the successful Bidder signifying the <br /> I <br /> 37 Contracting Agency's acceptance of the Bid Proposal. <br /> 38 <br /> 39 Notice to Proceed <br /> I 40 The written notice from the Contracting Agency or Engineer to the Contractor authorizing <br /> 41 and directing the Contractor to proceed with the Work and establishing the date on which <br /> 42 the Contract time begins. <br /> I <br /> 43 <br /> 44 Traffic <br /> 45 Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and <br /> 46 equestrian traffic. <br /> I47 <br /> I <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> IIIWO#3788 March 2,2023 SP-3 <br />