My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 2. The Contracting Agency receives the request before the time set for receipt of <br /> 2 Bid Proposals, and I <br /> 3 3. The revised or supplemented Bid Proposal (if any) is received by the Contracting <br /> 4 Agency before the time set for receipt of Bid Proposals. <br /> 5 I 6 If the Bidder's request to withdraw, revise, or supplement its Bid Proposal is received <br /> 7 before the time set for receipt of Bid Proposals, the Contracting Agency will return the <br /> 8 unopened Proposal package to the Bidder. The Bidder must then submit the revised or I <br /> 9 supplemented package in its entirety. If the Bidder does not submit a revised or <br /> 10 supplemented package, then its bid shall be considered withdrawn. <br /> 11 I 12 Late revised or supplemented Bid Proposals or late withdrawal requests will be date <br /> 13 recorded by the Contracting Agency and returned unopened. Mailed, emailed, or faxed <br /> 14 requests to withdraw, revise, or supplement a Bid Proposal are not acceptable. <br /> 15 I <br /> 16 1-02.13.RTF <br /> 17 1-02.13 Irregular Proposals <br /> 18 (October 1, 2020 APWA GSP) <br /> 19 <br /> 20 Delete this section and replace it with the following: <br /> 21 <br /> 22 1. A Proposal will be considered irregular and will be rejected if: <br /> 23 a. The Bidder is not prequalified when so required; <br /> 24 b. The authorized Proposal form furnished by the Contracting Agency is not <br /> 25 used or is altered; <br /> 26 c. The completed Proposal form contains any unauthorized additions, deletions, <br /> 27 alternate Bids, or conditions; I <br /> 28 d. The Bidder adds provisions reserving the right to reject or accept the award, <br /> 29 or enter into the Contract; <br /> 30 e. A price per unit cannot be determined from the Bid Proposal; <br /> 31 f. The Proposal form is not properly executed; I <br /> 32 g. The Bidder fails to submit or properly complete a Subcontractor list, if <br /> 33 applicable, as required in Section 1-02.6; <br /> 34 h. The Bidder fails to submit or properly complete a Disadvantaged Business I <br /> 35 Enterprise Certification, if applicable, as required in Section 1-02.6; <br /> 36 i. The Bidder fails to submit written confirmation from each DBE firm listed on <br /> 37 the Bidder's completed DBE Utilization Certification that they are in I <br /> 38 agreement with the bidder's DBE participation commitment, if applicable, as <br /> 39 required in Section 1-02.6, or if the written confirmation that is submitted fails <br /> 40 to meet the requirements of the Special Provisions; <br /> 41 j The Bidder fails to submit DBE Good Faith Effort documentation, if applicable, <br /> 42 as required in Section 1-02.6, or if the documentation that is submitted fails to <br /> 43 demonstrate that a Good Faith Effort to meet the Condition of Award was I <br /> 44 made; <br /> 45 k. The Bidder fails to submit a DBE Bid Item Breakdown form, if applicable, as <br /> 46 required in Section 1-02.6, or if the documentation that is submitted fails to <br /> 47 meet the requirements of the Special Provisions; I <br /> 48 I. The Bidder fails to submit DBE Trucking Credit Forms, if applicable, as <br /> 49 required in Section 1-02.6, or if the documentation that is submitted fails to <br /> 50 meet the requirements of the Special Provisions; I <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) I <br /> WO#3788 March 2,2023 SP-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.