My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 the Bidder's completed DBE Utilization Certification and/or the GFE as required by <br /> I <br /> 2 Section 1-02.6. <br /> 3 <br /> 4 DBE Bid Item Breakdown and DBE Trucking Credit Form <br /> I <br /> 5 6 The DBE Bid Item Breakdown and the DBE Trucking Credit Forms (if applicable) shall be <br /> received either with the Bid Proposal or as a Supplement to the Bid. The documents <br /> 7 shall be received no later than 48 hours (not including Saturdays, Sundays and Holidays) <br /> I <br /> 8 9 after the time for delivery of the Proposal. To be considered responsive, Bidders shall <br /> submit a completed DBE Bid Item Breakdown and a DBE Trucking Credit Form for each <br /> 10 DBE Trucking firm listed on the DBE Utilization Certification, however, minor errors and <br /> 11 corrections to DBE Bid Item Breakdown or DBE Trucking Credit Forms will be returned <br /> 12 for correction for a period up to five calendar days (not including Saturdays, Sundays <br /> 13 and Holidays) after the time for delivery of the Proposal. A DBE Bid Item Breakdown or <br /> I <br /> 14 DBE Trucking Credit Forms that are still incorrect after the correction period will be <br /> 15 determined to be non-responsive. <br /> 16 <br /> 17 Supplemental bid information submitted after the proposal submittal but within 48 hours <br /> I 18 of the time and date the proposal is due, shall be submitted as follows: <br /> 19 <br /> 20 1. In a sealed envelope labeled the same as for the Proposal, with "Supplemental <br /> I <br /> 21 22 Information" added, or <br /> 2. By facsimile to the following FAX number: N/A, or <br /> 23 3. By e-mail to the following e-mail address: sbridge@everettwa.gov <br /> I 24 <br /> 25 Proposals that are received as required will be publicly opened and read as specified in <br /> 26 Section 1-02.12. The Contracting Agency will not open or consider any Bid Proposal that <br /> I <br /> 27 is received after the time specified in the Call for Bids for receipt of Bid Proposals, or <br /> 28 received in a location other than that specified in the Call for Bids. The Contracting <br /> 29 Agency will not open or consider any "Supplemental Information" (DBE confirmations or <br /> 30 GFE documentation) that is received after the time specified above, or received in a <br /> I 31 location other than that specified in the Call for Bids. <br /> 32 <br /> 33 If an emergency or unanticipated event interrupts normal work processes of the <br /> I <br /> 34 Contracting Agency so that Proposals cannot be received at the office designated for <br /> 35 receipt of bids as specified in Section 1-02.12 the time specified for receipt of the <br /> 36 Proposal will be deemed to be extended to the same time of day specified in the <br /> I <br /> 37 38 solicitation on the first work day on which the normal work processes of the Contracting <br /> Agency resume. <br /> 39 <br /> I 40 <br /> 41 1-02.10.RTF <br /> 42 1-02.10 Withdrawing, Revising, or Supplementing Proposal <br /> I <br /> 43 (July 23, 2015 APWA GSP) <br /> 44 <br /> 45 Delete this section, and replace it with the following: <br /> 46 <br /> I47 After submitting a physical Bid Proposal to the Contracting Agency, the Bidder may <br /> 48 withdraw, revise, or supplement it if: <br /> 49 <br /> I 50 1. The Bidder submits a written request signed by an authorized person and <br /> 51 physically delivers it to the place designated for receipt of Bid Proposals, and <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> IWO#3788 March 2,2023 SP-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.