Laserfiche WebLink
I I <br /> SEE STANDARD DRAWING 808 PAVED SHOULDER TRAVELLED WAY GENERAL NOTES FOR LOOP INSTALLATION: <br /> FOR JUNCTION BOX INSTALLATION <br /> OR SIDEWALK AREA SEE DETAIL A 1. INSTALL JUNCTION BOX AND LEAD-IN CONDUIT. <br /> SEE SPLICE DETAIL THIS SHEET 2. SAW LOOP SLOTS AND LEAD-IN SLOTS. <br /> THIS SHEET <br /> 3. LAY OUT LOOP WIRE BEGINNING ATJUNCTION BOX,ALLOWING 5'MINIMUM SLACK. <br /> _�`!—' 4. INSTALL WIRE IN LOOP SLOT.SEE LOOP WINDING DETAIL.1 <br /> SEE NOTE 11—� <br /> 7'*_ w 5. RETURN TO JUNCTION BOX AND IDENTIFY LEADS WITH PLAN DETECTOR NUMBER AND <br /> r",...: o PAVED SHOLDER s"FOR START AND"F"FOR FINISH. <br /> — —� 6. TWIST EACH PAIR OF LEAD-IN WIRES TWO TURNS SEE PLANS FOR LolizR S PER FOOT FROM LOOP TO JUNCTION <br /> BOX AND INSTALL IN LEAD-IN SLOT AND CONDUIT.REVERSE DIRECTION OF TWIST FOR <br /> CONDUITSIZE� h�i SEE DETAILAEACH SUCCESSIVE PAIR INSTALLED. <br /> ,,,._...„,,,,,,-..,.,- THIS SHEET 7. CONSTRUCT SUPPLEMENTAL SPLICE CONTAINING ANY SERIES OR PARALLEL LOOP <br /> CONNECTIONS REQUIRED IN PLANS.SUPPLEMENTAL SPLICES ARE SUBJECT TO THE <br /> SAME REQUIREMENTS SHOWN FOR THE LOOP LEAD AND SHIELDED CABLE SPLICE.IF <br /> 6"DEEP APPROVED BY ENGINEER SCOTCHLOK 3570 EPDXY KIT SEALING PACKS MAY BE <br /> SUBSTITUTED FOR THE SCOTCHCAST 82-B1 FOR SUPPLEMENTAL SPLICES. <br /> GRAVEL BASE SEE TABLE A <br /> FOR CONDUIT SIZE 8. SPLICE LOOP LEADS OR SUPPLEMENTAL SPLICE LEADS TO SHIELDED CABLE AS NOTED. <br /> 9. COMPLETE INSTALLATION AND TEST LOOP CIRCUITS OR COMBINATION LOOP CIRCUITS. <br /> JUNCTION BOX GURB &GUTTER SEE WSDOT STANDARD SPEC 8-20.3(14)D. <br /> 10. FOR LOOP LOCATION REFER TO STANDARD DRAWING 805 AND PLANS. <br /> TYPICAL CONDUIT PLACEMENT FOR LOOP LEAD-IN WIRES 11. SEAL ENDS OF CONDUIT WITH ELECTRICAL PUTTY OF SILICONE. <br /> 12. DRILL HOLE FOR HOME-RUN CONDUIT 1"LARGER THAN CONDUIT AND FILL VOID WITH <br /> HOT MIX ASPHALT. <br /> LOOP LEAD PAIRS 1-2 3 4-5 6-8 9-12 13. ALL SPLICES SHALL BE ABLE TO BE RAISED A MINIMUM OF 16"ABOVE GROUND LINE. <br /> CONDUIT SIZE(MIN) 2" 2" 2" (2)2" (2)2" 14. BUCHANAN 2006S SPLICE CAPS,CRIMP WITH BUCHANAN C-24 CRIMPER FOLLOWING <br /> TRENCH WIDTH(MIN) 4" 4" 4" 6" 6" MANUFACTURE'S INSTALLATION PROCEDURE.SOLDER CRIMP(NO OPEN FLAME TORCH <br /> NOTE:ALL STOP BAR LOCATIONS SHALL HAVE(2)2"CONDUIT SIZE MINIMUM OR SIMILAR IS ALLOWED)AND TAPE WITH 2 LAYERS OF TAPE. <br /> TABLE A ®INSTALLATION NOTES: <br /> 1. SEALANT-CRAFCO PART NO 34271,OR APPROVED EQUAL. <br /> 2. LOOP WIRE-NUMBER VARIES SEE LOOP WINDING DETAILS STANDARD DRAWING 810. <br /> DETECTOR LEAD-IN CABLE FOIL SHIELD 3. LEAD-IN WIRES:ONE PAIR FOR EACH LOOP SERVED,3 PAIR MAX PER SAWCUT. <br /> (IMSA 50-2-1984)OR 3 <br /> SHIELDED PAIR CABLE 4. EXTEND SAWCUT SUFFICIENT LENGTH TO PROVIDE FULL SAWCUT DEPTH AROUND <br /> < (BELDEN 1037A)AS NOTED 1 1/2 1" SEE NOTE 14 CORNERS. <br /> EDGE OF TRAVELLED WAY <br /> SEAL ENDS WITH OR CURB/GUTTER 5. LOCATE CORNER SAWCUT AT 45°TO SIDE CUTS TO PREVENT KINK IN LOOP WIRE AND <br /> f ELECTRICAL PUTTY A ALSO MINIMIZE VOID.TRIANGULAR VOID WILL BE REMOVED AND FILLED WITH <br /> o' AND TAPE ti 6" SEALANT. <br /> LOOP WIRE#14 <br /> *DRAIN WIRE �A A <br /> (IMSA51-7) <br /> n <br /> W -GROUND DRAIN WIRE AT SCOTCHAST EPDXY <br /> i AMPLIFIER ONLY 82-B1 SPLICE KIT SEE NOTE 12 <br /> °a FILLED WITH EPDXY SAWCUT(TYP) CITY OF EVERETT <br /> F S USE SAME PROCEDURE PAIR LEAD-IN PUBLIC WORKS DEPARTMENT <br /> - CABLE AND MULTIPLELE LOOPLOOP SPLICE <br /> `" SPLICE DETAIL DETAIL �' <br /> B'V vzisASS ICOvaiT I��rxmLHE. Ip—ESH <br /> 04/07/2017 <br /> MM.ONAWINO 16, <br /> TRAFFIC INDUCTION LOOP <br /> y JUNCTION BOX,SPLICE&NOTES 809 <br /> I <br /> - - - - - - - - - - - - - - - - - - - <br />