My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I I <br /> 2 8. Documentation of GFE must include copies of each DBE and non-DBE <br /> 3 subcontractor quotes submitted to the Bidder when a non-DBE <br /> 4 subcontractor is selected over a DBE for Work on the Contract. (ref. <br /> I <br /> 5 6 updated DBE regulations—26.53(b)(2)(vi) &App. A) <br /> 7 Administrative Reconsideration of GFE Documentation <br /> I 8 A Bidder has the right to request reconsideration if the GFE documentation submitted <br /> 9 with their Bid was determined to be inadequate. <br /> 10 <br /> 11 11 • The Bidder must request within 48 hours of notification of being <br /> 12 nonresponsive or forfeit the right to reconsideration. <br /> 13 <br /> I 14 • The reconsideration decision on the adequacy of the Bidder's GFE <br /> 15 documentation shall be made by an official who did not take part in the <br /> 16 original determination. <br /> 17 <br /> II18 • Only original GFE documentation submitted as a supplement to the Bid <br /> 19 shall be considered. The Bidder shall not introduce new documentation at <br /> 20 the reconsideration hearing. <br /> I 21 <br /> 22 • The Bidder shall have the opportunity to meet in person with the official for <br /> 23 the purpose of setting forth the Bidder's position as to why the GFE <br /> I 24 documentation demonstrates a sufficient effort. <br /> 25 <br /> 26 • The reconsideration official shall provide the Bidder with a written decision <br /> I 27 on reconsideration within five working days of the hearing explaining the <br /> 28 basis for their finding. <br /> 29 <br /> I 30 DBE Bid Item Breakdown <br /> 31 The Bidder shall submit a DBE Bid Item Breakdown Form (WSDOT Form 272-054) <br /> 32 as specified in the Special Provisions for Section 1-02.9, Delivery of Proposal. <br /> 33 <br /> I <br /> 34 DBE Trucking Credit Form <br /> 35 The Bidder shall submit a DBE Trucking Credit Form (WSDOT Form 272-058), as <br /> 36 specified in the Special Provisions for Section 1-02.9, Delivery of Proposal. <br /> i 37 <br /> 38 Note: The DBE Trucking Credit Form is only required for a DBE Firm listed on <br /> 39 the DBE Utilization Certification as a subcontractor for "Trucking" or <br /> I 40 "Hauling" and are performing a part of a bid item. For example, if the <br /> 41 item of Work is Structure Excavation including Haul, and another firm is <br /> 42 doing the excavation and the DBE Trucking firm is doing the haul, the <br /> I 43 form is required. For a DBE subcontractor that is responsible for an <br /> 44 entire item of work that may require some use of trucks, the form is not <br /> 45 required. <br /> 1 46 <br /> I <br /> 2023 FEDERAL OVERLAY <br /> I FEDERAL AID STBGUL-2715(011) <br /> W0#3788 March 2,2023 SP-37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.