My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 Procedures between Award and Execution <br /> 2 After Award and prior to Execution, the Contractor shall provide the additional <br /> 3 information described below. Failure to comply shall result in the forfeiture of the <br /> 4 Bidder's Proposal bond or deposit. <br /> 5 I 6 1. A list of all firms who submitted a bid or quote in attempt to participate in <br /> 7 this project whether they were successful or not. Include the business <br /> 8 name and mailing address. I <br /> 9 <br /> 10 Note: The firms identified by the Contractor may be contacted by the <br /> 11 Contracting Agency to solicit general information as follows: age of the 111 <br /> 12 firm and average of its gross annual receipts over the past three years. <br /> 13 <br /> 14 Procedures after Execution III15 Commercially Useful Function (CUF) <br /> 16 The Contractor may only take credit for the payments made for Work performed <br /> 17 by a DBE that is determined to be performing a CUF. Payment must be 1 <br /> 18 commensurate with the work actually performed by the DBE. This applies to all <br /> 19 DBEs performing Work on a project, whether or not the DBEs are COA, if the <br /> 20 Contractor wants to receive credit for their participation. The Engineer will <br /> 21 conduct CUF reviews to ascertain whether DBEs are performing a CUE. A DBE I <br /> 22 performs a CUF when it is carrying out its responsibilities of its contract by <br /> 23 actually performing, managing, and supervising the Work involved. The DBE <br /> 24 must be responsible for negotiating price; determining quality and quantity; I <br /> 25 ordering the material, installing (where applicable); and paying for the material <br /> 26 itself. If a DBE does not perform "all" of these functions on a furnish-and-install <br /> 27 contract, it has not performed a CUF and the cost of materials cannot be counted <br /> 28 toward DBE COA Goal. Leasing of equipment from a leasing company is <br /> 29 allowed. However, leasing/purchasing equipment from the Contractor is not <br /> 30 allowed. Lease agreements shall be provided prior to the Subcontractor 1 <br /> 31 beginning Work. Any use of the Contractor's equipment by a DBE may not be <br /> 32 credited as countable participation. <br /> 33 1 34 The DBE does not perform a CUF if its role is limited to that of an extra <br /> 35 participant in a transaction, contract, or project through which the funds are <br /> 36 passed in order to obtain the appearance of DBE participation. <br /> 37 <br /> 38 In order for a DBE traffic control company to be considered to be performing a <br /> 39 CUF, the DBE must be in control of its work inclusive of supervision. The DBE <br /> 40 shall employ a Traffic Control Supervisor who is directly involved in the I <br /> 41 management and supervision of the traffic control employees and services. <br /> 42 <br /> 43 The following are some of the factors that the Engineer will use in determining <br /> 44 whether a DBE trucking company is performing a CUF: <br /> 45 <br /> 46 • The DBE shall be responsible for the management and supervision of 1 <br /> 47 the entire trucking operation for which it is responsible on the contract. <br /> 48 The owner demonstrates business related knowledge, shows up on <br /> 49 site and is determined to be actively running the business. <br /> 50 1 <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 SP-38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.