My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 the material itself." The Contractor shall submit DBE Joint Check Request Form <br /> 2 tothe Engineer and be in receipt of written approval prior to using a joint check. <br /> 3 <br /> 4 Material costs paid by the Contractor directly to the material supplier are not <br /> 5 allowed. If proper procedures are not followed or the Engineer determines that I <br /> 6 the arrangement results in lack of independence for the DBE involved, no DBE <br /> 7 credit will be given for the DBE's participation as it relates to the material cost. <br /> 8 <br /> 9 Prompt Payment <br /> 10 Prompt payment to all subcontractors shall be in accordance with Section 1- <br /> 11 08.1. Prompt payment requirements apply to progress payments as well as I <br /> 12 return of retainage. <br /> 13 <br /> 14 Subcontracts <br /> 15 Prior to a DBE performing Work on the Contract, an executed subcontract <br /> 16 between the DBE and the Contractor shall be submitted to the Engineer. The <br /> 17 executed subcontracts shall be submitted by email to the following email <br /> 18 address <br /> 19 <br /> 20 *** NWRegionOEO@wsdot.wa.gov *** <br /> 21 1 22 The prime contractor shall notify the Engineer in writing within five calendar days <br /> 23 of subcontract submittal. <br /> 24 <br /> 25 <br /> 26 Reporting <br /> 27 The Contractor and all subcontractors/suppliers/service providers that utilize I <br /> 28 DBEs to perform work on the project, shall maintain appropriate records that will <br /> 29 enable the Engineer to verify DBE participation throughout the life of the project. <br /> 30 I 31 Refer to Section 1-08.1 for additional reporting requirements associated with this <br /> 32 contract. <br /> 33 <br /> 34 Changes in COA Work Committed to DBE <br /> 35 The Contractor shall utilize the COA DBEs to perform the work and supply the <br /> 36 materials for which each is committed unless prior written approval by the Engineer <br /> 37 is received by the Contractor. The Contractor shall not be entitled to any payment I <br /> 38 for work or material completed by the Contractor or subcontractors that was <br /> 39 committed to be completed by the COA DBEs in the DBE Utilization Certification <br /> 40 form. <br /> 41 <br /> 42 Owner Initiated Changes <br /> 43 In instances where the Engineer makes changes that result in changes to Work I <br /> 44 that was committed to a COA DBE the Contractor may be directed to substitute <br /> 45 for the Work. <br /> 46 <br /> 47 Contractor Initiated Changes <br /> 48 The Contractor cannot change the scope or reduce the amount of work <br /> 49 committed to a COA DBE without good cause. Reducing DBE Commitment is <br /> 50 viewed as partial DBE termination, and therefore subject to the termination <br /> 51 procedures below. <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 SP-40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.