Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 • The DBE itself shall own and operate at least one fully licensed, <br /> 2 insured, and operational truck used on the Contract. The drivers of the <br /> 3 trucks owned and leased by the DBE must be exclusively employed by <br /> 4 the DBE and reflected on the DBE's payroll. <br /> I5 <br /> 6 • Lease agreements for trucks shall indicate that the DBE has exclusive <br /> 7 use of and control over the truck(s). This does not preclude the leased <br /> 8 truck from working for others provided it is with the consent of the DBE <br /> 9 and the lease provides the DBE absolute priority for use of the leased <br /> 10 truck. <br /> 1 11 <br /> 12 • Leased trucks shall display the name and identification number of the <br /> 13 DBE. <br /> I 14 <br /> 15 UDBE/DBE/FSBE Truck Unit Listing Log <br /> 16 In addition to the subcontracting requirements of Section 1-08.1, each DBE <br /> 17 trucking firm shall submit supplemental information consisting of a completed <br /> I18 Primary UDBE/DBE/FSBE Truck Unit Listing Log (WSDOT Form 350-077), copy <br /> 19 of vehicle registrations, and all Rental/Lease agreements (if applicable). The <br /> 20 supplemental information shall be submitted to the Engineer prior to any trucking <br /> I 21 services being performed for DBE credit. Incomplete or incorrect supplemental <br /> 22 information will be returned for correction. The corrected Primary <br /> 23 UDBE/DBE/FSBE Truck Unit Listing Log and any Updated Primary <br /> I 24 UDBE/DBE/FSBE Truck Unit Listing Logs shall be submitted and accepted by <br /> 25 the Engineer no later than ten calendar days of utilizing applicable trucks. <br /> 26 Failure to submit or update the DBE Truck Unit Listing Log may result in trucks <br /> I 27 not being credited as DBE participation. <br /> 28 <br /> 29 Each DBE trucking firm shall complete a Daily UDBE/DBE/FSBE Trucking Unit <br /> I 30 Listing Log for each day that the DBE performs trucking services for DBE credit. <br /> 31 The Daily UDBE/DBE/FSBE Trucking Unit Listing Log forms shall be submitted <br /> 32 to the Engineer by Friday of the week after the work was performed. <br /> 33 I 34 Joint Checking <br /> 35 A joint check is a check between a Subcontractor and the Contractor to the <br /> 36 supplier of materials/supplies. The check is issued by the Contractor as payer <br /> 37 to the Subcontractor and the material supplier jointly for items to be incorporated <br /> 38 into the project. The DBE must release the check to the supplier, while the <br /> 39 Contractor acts solely as the guarantor. <br /> I 40 <br /> 41 A joint check agreement must be approved by the Engineer and requested by <br /> 42 the DBE involved using the DBE Joint Check Request Form (form # 272-053) <br /> I 43 prior to its use. The form must accompany the DBE Joint Check Agreement <br /> 44 between the parties involved, including the conditions of the arrangement and <br /> 45 expected use of the joint checks. <br /> 46 I <br /> 47 The approval to use joint checks and the use will be closely monitored by the <br /> 48 Engineer. To receive DBE credit for performing a CUF with respect to obtaining <br /> 49 materials and supplies, a DBE must "be responsible for negotiating price, <br /> I50 determining quality and quantity, ordering the material, installing and paying for <br /> I <br /> 2023 FEDERAL OVERLAY <br /> I FEDERAL AID#STBGUL-2715(011) <br /> WO#3788 March 2,2023 SP-39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.