My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1 2 A noise variance for night work has been obtained on behalf of the Contractor. <br /> 3 All mitigation measures stated in the contract and appendix shall be adhered to. <br /> 4 <br /> 5 Broadway—41st St to 3501/3502 I <br /> 6 No detour for any type of work, except for castings, will be permitted between <br /> 7 5:00 am. and 10:00 pm.A detour shall be in place for all work between 10:00pm <br /> 8 and 5:00am. Casting adjustments shall not be permitted between 5:00am to I <br /> 9 7:30am and 2:30pm to 8:00pm. <br /> 10 <br /> 11 A noise variance for night work has been obtained on behalf of the Contractor. I <br /> 12 All mitigation measures stated in the contract and appendix shall be adhered to. <br /> 13 <br /> 14 Broadway—35th St to Hewitt Ave I <br /> 15 One lane shall remain open in each north/south direction between 6:00am and <br /> 16 10:00pm. Casting adjustments shall not be permitted between 6:00am to <br /> 17 7:30am and 2:30pm to 7:00pm. No lane closures will be permitted between <br /> 18 10:00pm and 6:00 am. The contractor has been granted a one (1) hour early ' <br /> 19 start from 6:00am to 7:00am for traffic control setup only. <br /> 20 <br /> 21 Intersection at Broadway & Pacific Ave I <br /> 22 One lane shall remain open in each north/south and each east/west direction <br /> 23 between 7:00pm and 4:30am. Casting adjustments shall not be permitted <br /> 24 between 6:00am to 7:30am and 2:30pm to 7:00pm. No lane closures will be I <br /> 25 permitted between 4:30am and 7:00pm. <br /> 26 <br /> 27 A noise variance for night work has been obtained on behalf of the Contractor. <br /> 28 All mitigation measures stated in the contract and appendix shall be adhered to. <br /> 29 <br /> 30 Intersection at Broadway & Wall St I <br /> 31 One lane shall remain open in each north/south and each east/west direction <br /> 32 between 7:00pm and 4:30am. Casting adjustments shall not be permitted <br /> 33 between 6:00am to 7:30am and 2:30pm to 7:00pm. No lane closures will be <br /> 34 permitted between 4:30am and 7:00pm. <br /> 35 <br /> 36 A noise variance for night work has been obtained on behalf of the Contractor. <br /> 37 All mitigation measures stated in the contract and appendix shall be adhered to. I <br /> 38 *** <br /> 39 <br /> 40 If the Engineer determines the permitted closure hours adversely affect traffic, the I <br /> 41 Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br /> 42 in writing of any change in the closure hours. Exceptions to these restrictions may be <br /> 43 considered by the Engineer on a case-by-case basis following a written request by I <br /> 44 the Contractor. <br /> 45 <br /> 46 Lane, ramp, shoulder, and roadway closures are not allowed on any of the following: I <br /> 47 <br /> 48 1. A holiday, <br /> 49 <br /> I <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) I <br /> WO#3788 March 2,2023 SP-52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.