Laserfiche WebLink
I <br /> 1 1 2 A noise variance for night work has been obtained on behalf of the Contractor. <br /> 3 All mitigation measures stated in the contract and appendix shall be adhered to. <br /> 4 <br /> 5 Broadway—41st St to 3501/3502 I <br /> 6 No detour for any type of work, except for castings, will be permitted between <br /> 7 5:00 am. and 10:00 pm.A detour shall be in place for all work between 10:00pm <br /> 8 and 5:00am. Casting adjustments shall not be permitted between 5:00am to I <br /> 9 7:30am and 2:30pm to 8:00pm. <br /> 10 <br /> 11 A noise variance for night work has been obtained on behalf of the Contractor. I <br /> 12 All mitigation measures stated in the contract and appendix shall be adhered to. <br /> 13 <br /> 14 Broadway—35th St to Hewitt Ave I <br /> 15 One lane shall remain open in each north/south direction between 6:00am and <br /> 16 10:00pm. Casting adjustments shall not be permitted between 6:00am to <br /> 17 7:30am and 2:30pm to 7:00pm. No lane closures will be permitted between <br /> 18 10:00pm and 6:00 am. The contractor has been granted a one (1) hour early ' <br /> 19 start from 6:00am to 7:00am for traffic control setup only. <br /> 20 <br /> 21 Intersection at Broadway & Pacific Ave I <br /> 22 One lane shall remain open in each north/south and each east/west direction <br /> 23 between 7:00pm and 4:30am. Casting adjustments shall not be permitted <br /> 24 between 6:00am to 7:30am and 2:30pm to 7:00pm. No lane closures will be I <br /> 25 permitted between 4:30am and 7:00pm. <br /> 26 <br /> 27 A noise variance for night work has been obtained on behalf of the Contractor. <br /> 28 All mitigation measures stated in the contract and appendix shall be adhered to. <br /> 29 <br /> 30 Intersection at Broadway & Wall St I <br /> 31 One lane shall remain open in each north/south and each east/west direction <br /> 32 between 7:00pm and 4:30am. Casting adjustments shall not be permitted <br /> 33 between 6:00am to 7:30am and 2:30pm to 7:00pm. No lane closures will be <br /> 34 permitted between 4:30am and 7:00pm. <br /> 35 <br /> 36 A noise variance for night work has been obtained on behalf of the Contractor. <br /> 37 All mitigation measures stated in the contract and appendix shall be adhered to. I <br /> 38 *** <br /> 39 <br /> 40 If the Engineer determines the permitted closure hours adversely affect traffic, the I <br /> 41 Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br /> 42 in writing of any change in the closure hours. Exceptions to these restrictions may be <br /> 43 considered by the Engineer on a case-by-case basis following a written request by I <br /> 44 the Contractor. <br /> 45 <br /> 46 Lane, ramp, shoulder, and roadway closures are not allowed on any of the following: I <br /> 47 <br /> 48 1. A holiday, <br /> 49 <br /> I <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) I <br /> WO#3788 March 2,2023 SP-52 <br />