Laserfiche WebLink
I <br /> 1 2. Lump Sum Items in the Bid Form — based on the approved Contractor's lump sum II2 breakdown for that item, or absent such a breakdown, based on the Engineer's <br /> 3 determination. <br /> 4 3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job site <br /> 5 or other storage area approved by the Engineer. 111 <br /> 6 4. Change Orders —entitlement for approved extra cost or completed extra work as <br /> 7 determined by the Engineer. <br /> 8 I <br /> 9 Progress payments will be made in accordance with the progress estimate less: <br /> 10 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; <br /> 11 2. The amount of progress payments previously made; and <br /> 12 3. Funds withheld by the Contracting Agency for disbursement in accordance with the <br /> 13 Contract Documents. 1 <br /> 14 <br /> 15 Progress payments for work performed shall not be evidence of acceptable performance <br /> 16 or an admission by the Contracting Agency that any work has been satisfactorily <br /> 17 completed. The determination of payments under the contract will be final in accordance <br /> 18 with Section 1-05.1. <br /> 19 I <br /> 20 Failure to perform any of the obligations under the Contract by the Contractor may be <br /> 21 decreed by the Contracting Agency to be adequate reason for withholding any payments <br /> 22 until compliance is achieved. <br /> 23 <br /> 24 Upon completion of all Work and after final inspection (Section 1-05.11), the amount due <br /> 25 the Contractor under the Contract will be paid based upon the final estimate made by the <br /> 26 Engineer and presentation of a Final Contract Voucher Certification to be signed by the <br /> 27 Contractor. The Contractor's signature on such voucher shall be deemed a release of all <br /> 28 claims of the Contractor unless a Certified Claim is filed in accordance with the <br /> 29 requirements of Section 1-09.11 and is expressly excepted from the Contractor's <br /> 30 certification on the Final Contract Voucher Certification. The date the Contracting Agency <br /> 31 signs the Final Contract Voucher Certification constitutes the final acceptance date <br /> 32 (Section 1-05.12). <br /> 33 <br /> 34 If the Contractor fails, refuses, or is unable to sign and return the Final Contract Voucher I <br /> 35 Certification or any other documentation required for completion and final acceptance of <br /> 36 the Contract, the Contracting Agency reserves the right to establish a Completion Date <br /> 37 (for the purpose of meeting the requirements of RCW 60.28) and unilaterally accept the <br /> 38 Contract. Unilateral final acceptance will occur only after the Contractor has been <br /> 39 provided the opportunity, by written request from the Engineer, to voluntarily submit such <br /> 40 documents. If voluntary compliance is not achieved, formal notification of the impending I <br /> 41 establishment of a Completion Date and unilateral final acceptance will be provided by <br /> 42 email with delivery confirmation from the Contracting Agency to the Contractor, which will <br /> 43 provide 30 calendar days for the Contractor to submit the necessary documents. The 30 <br /> 44 calendar day period will begin on the date the email with delivery confirmation is received <br /> 45 by the Contractor. The date the Contracting Agency unilaterally signs the Final Contract <br /> 46 Voucher Certification shall constitute the Completion Date and the final acceptance date I <br /> 47 (Section 1-05.12). The reservation by the Contracting Agency to unilaterally accept the <br /> 48 Contract will apply to Contracts that are Physically Completed in accordance with <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) I <br /> WO#3788 March 2,2023 SP-62 <br />