HM Pacific Northwest Inc. 5/18/2023
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
HM Pacific Northwest Inc. 5/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2023 10:08:21 AM
Creation date
5/19/2023 10:00:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HM Pacific Northwest Inc.
Approval Date
5/18/2023
Council Approval Date
4/26/2023
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2023 Federal Overlay
Public Works WO Number
PW3788
Tracking Number
0003683
Total Compensation
$1,553,777.40
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 2. Lump Sum Items in the Bid Form — based on the approved Contractor's lump sum II2 breakdown for that item, or absent such a breakdown, based on the Engineer's <br /> 3 determination. <br /> 4 3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job site <br /> 5 or other storage area approved by the Engineer. 111 <br /> 6 4. Change Orders —entitlement for approved extra cost or completed extra work as <br /> 7 determined by the Engineer. <br /> 8 I <br /> 9 Progress payments will be made in accordance with the progress estimate less: <br /> 10 1. Retainage per Section 1-09.9(1), on non FHWA-funded projects; <br /> 11 2. The amount of progress payments previously made; and <br /> 12 3. Funds withheld by the Contracting Agency for disbursement in accordance with the <br /> 13 Contract Documents. 1 <br /> 14 <br /> 15 Progress payments for work performed shall not be evidence of acceptable performance <br /> 16 or an admission by the Contracting Agency that any work has been satisfactorily <br /> 17 completed. The determination of payments under the contract will be final in accordance <br /> 18 with Section 1-05.1. <br /> 19 I <br /> 20 Failure to perform any of the obligations under the Contract by the Contractor may be <br /> 21 decreed by the Contracting Agency to be adequate reason for withholding any payments <br /> 22 until compliance is achieved. <br /> 23 <br /> 24 Upon completion of all Work and after final inspection (Section 1-05.11), the amount due <br /> 25 the Contractor under the Contract will be paid based upon the final estimate made by the <br /> 26 Engineer and presentation of a Final Contract Voucher Certification to be signed by the <br /> 27 Contractor. The Contractor's signature on such voucher shall be deemed a release of all <br /> 28 claims of the Contractor unless a Certified Claim is filed in accordance with the <br /> 29 requirements of Section 1-09.11 and is expressly excepted from the Contractor's <br /> 30 certification on the Final Contract Voucher Certification. The date the Contracting Agency <br /> 31 signs the Final Contract Voucher Certification constitutes the final acceptance date <br /> 32 (Section 1-05.12). <br /> 33 <br /> 34 If the Contractor fails, refuses, or is unable to sign and return the Final Contract Voucher I <br /> 35 Certification or any other documentation required for completion and final acceptance of <br /> 36 the Contract, the Contracting Agency reserves the right to establish a Completion Date <br /> 37 (for the purpose of meeting the requirements of RCW 60.28) and unilaterally accept the <br /> 38 Contract. Unilateral final acceptance will occur only after the Contractor has been <br /> 39 provided the opportunity, by written request from the Engineer, to voluntarily submit such <br /> 40 documents. If voluntary compliance is not achieved, formal notification of the impending I <br /> 41 establishment of a Completion Date and unilateral final acceptance will be provided by <br /> 42 email with delivery confirmation from the Contracting Agency to the Contractor, which will <br /> 43 provide 30 calendar days for the Contractor to submit the necessary documents. The 30 <br /> 44 calendar day period will begin on the date the email with delivery confirmation is received <br /> 45 by the Contractor. The date the Contracting Agency unilaterally signs the Final Contract <br /> 46 Voucher Certification shall constitute the Completion Date and the final acceptance date I <br /> 47 (Section 1-05.12). The reservation by the Contracting Agency to unilaterally accept the <br /> 48 Contract will apply to Contracts that are Physically Completed in accordance with <br /> I <br /> 2023 FEDERAL OVERLAY <br /> FEDERAL AID#STBGUL-2715(011) I <br /> WO#3788 March 2,2023 SP-62 <br />